Inspections for the day of: Monday, September 14, 2009.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR09-00342 FIR-Aging Inspection9/14/20099/14/20099/14/2009 4:55:00 PM NR
wip
FIR09-00291 INSP-Sprinkler Rough-in/Hydro9/14/20099/14/20099/14/2009 4:54:39 PMPPASS
The piping to the 10 pendants in the dry storage area in the rear of the store is ok to cover and the piping in the front canopy is ok to cover. I noted that the unsprinklered area above the sprinkler area of the canopy will required an inspection to verify that the fire retardant has been applied when completed. The general contractor stated that a special inspection was going to be performed to verify correct application of the fire retardant and he would supply paper work for verification.
FIR08-00830 INSP-Sprinkler Rough-in/Hydro9/14/20099/14/20099/14/2009 4:51:52 PMPCANC
Lonnie Phone #: ###-####
BLD09-00109 FIRE-Final Inspection9/14/20099/14/20099/14/2009 4:51:28 PMPPASS
life safety passed. the emergency lights have been repaired.
BLD09-00477 FIRE-Final Inspection9/11/20099/14/20099/14/2009 1:19:17 PMAPASS
life safety passed
BLD09-01495 FIRE-Final Inspection9/10/20099/14/20099/14/2009 11:58:51 AMAFAIL
Repair the exit signs and emergency lights, coordinate fire alarm test for the visual confirmation as discussed, the paint booth is not shown on the plans which will require a resubmittal, provide modified sprinkler protection at the "Clear Walls" obstructions, resubmit plans showing occupant loads/square footage so exit signage and emergency light requirements can be determined by plan review.
BLD09-01552 FIRE-Final Inspection9/11/20099/14/20099/14/2009 11:56:11 AMAPART
A partial temporary was given on the life safety with mark sentennos permission. Per Mark every thing has to be corrected by the end of this week or the building will be posted "Do not Occupy" on Monday morning. There are four items needing correction, resubmit plans showing the correct floor layout, remove trip hazards in the rear of the store, provide additional exit signs and repair all of the emergency lighting.