Inspections for the day of: Monday, September 14, 2009.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD09-00965 BLD-Concrete9/11/20099/14/20099/15/2009 7:13:12 AMPDONE
masonary wall insp. Phone #: ###-####
BLD09-01552 BLD-Final9/11/20099/14/20099/14/2009 4:23:51 PMPPART
travis Phone #: ###-####. Needs to provide plans that match existing floorplan and provide 36 inch high counter for ADA compliance.
BLD09-01209 BLD-Final9/14/20099/14/20099/14/2009 3:17:15 PMPPASS
Brandon Phone #: ###-####
BLD09-01209 DOC - Permit Finaled9/14/20099/14/20099/14/2009 3:16:05 PMPPASS
Letter of completion issued.
BLD09-01495 BLD-Final9/10/20099/14/20099/14/2009 2:23:09 PMPFAIL
for occupancy // Ed Reagles ###-#### xt.115. Provide plan showing all areas that are being occupied, repair exit lighting, Provide approved plans and permits for paint booth and get all required inspections or have paint booth removed. Provide panic hardware at south loading dock door or remove exit sign. Remove illuminated exit sign showing exit into courtyard and replace with correct exit signage. c/nissued to Ed Reagles. Also inspection was performed with Ed Reagles while on site.
ESC07-00768 Aging Inspection9/14/20099/14/20099/14/2009 12:32:57 PM DONE
ESC07-00768 DOC - Permit Expired9/14/20099/14/20099/14/2009 12:32:48 PMPPASS
Final stabalization was completed. Permit is expired.
MIS09-00072 MIS-Aging Inspection9/14/20099/14/20099/14/2009 12:31:46 PM DONE
MIS09-00072 DOC - Permit Finaled9/14/20099/14/20099/14/2009 12:31:38 PMPPASS
Demo has ben completed.
BLD09-01136 BLD-Final9/11/20099/14/20099/14/2009 11:23:35 AMAPASS
gail Phone #: ###-####. ok for perm occ. Checked with Andrea with Zoning. ok.
ESC08-00407 Site Preparation9/14/20099/14/20099/14/2009 10:31:34 AMAFAIL
Wip. Construction enterance has not been stabalized. COntactec RP and gave verbal c/n. Noted that would be done by end of work today.
MIS09-00026 MIS-Aging Inspection9/14/20099/14/20099/14/2009 10:05:50 AM PASS
wip.
ESC09-00406 General Inspection9/14/20099/14/20099/14/2009 10:05:13 AMAPASS
BLD09-01035 BLD-Framing/Rough-in9/11/20099/14/20099/14/2009 10:04:54 AMAPART
Jason Phone #: ###-####. Needs to provide additional engineering for soffit to bottom of roof joist. Still needs plumbing ri insp. Mech contractor needs to pull mech permit. Also needs to add all backing in restrooms for ada equipment. Contractor will call back for anothrer framing insp.
BLD09-01225 BLD-Conference9/11/20099/14/20099/14/2009 9:27:35 AMADONE
Plumbing insp Jim Johnson inquiring ...... Need verification......That Work being done, and equipment being moved in, requires proper permits (Bldg, Electr Etc). This Permit Does not allow any work to be done.
Jim Sly. Will need to pull elec. permit only.