ESC10-00374
| BMP Violation | 9/13/2010 | 9/14/2010 | 9/14/2010 4:19:05 PM | P | FAIL |
|
|
Verbal to RP: Must use an approved inlet protection for protecting the storm drain. No external protection. Also the installation of the sediment barrier must be corrected with staking the wattles and clear the areas where it is not trenched in. Will re-inspect in the afternoon on 09/15/10
|
ESC10-00676
| Site Preparation | 9/10/2010 | 9/14/2010 | 9/14/2010 2:09:40 PM | A | PASS |
|
|
|
ESC10-00674
| Site Preparation | 9/14/2010 | 9/14/2010 | 9/14/2010 1:19:34 PM | | PASS |
|
|
At the end of the day, the bio filtration socks will be installed at the bottom of slope.
|
ESC10-00610
| Site Preparation | 9/14/2010 | 9/14/2010 | 9/14/2010 9:48:04 AM | | FAIL |
|
|
Verbal to RP: Install inlet protection down gradient to the storm drain.
|
ESC10-00630
| Site Preparation | 9/14/2010 | 9/14/2010 | 9/14/2010 9:35:10 AM | | PASS |
|
|
|
ESC10-00383
| Site Preparation | 9/14/2010 | 9/14/2010 | 9/14/2010 9:30:13 AM | | NR |
|
|
Still has a pending stop work order per the building dept.
|