FIR11-00449
| INSP-Final Inspection | 9/14/2011 | 9/14/2011 | 9/14/2011 12:12:21 PM | P | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR11-00449
| INSP-Sprinkler Rough-in | 9/14/2011 | 9/14/2011 | 9/14/2011 12:10:30 PM | P | PART |
|
|
Rough-in passed.
|
BLD09-01405
| BLD-Aging Inspection | 9/14/2011 | 9/14/2011 | 9/14/2011 11:48:49 AM | A | FAIL |
|
|
Overspaced fire sprinklers at one area.
|
FIR11-00484
| INSP-Sprinkler Rough-in | 9/13/2011 | 9/14/2011 | 9/14/2011 11:46:33 AM | A | PART |
|
|
Relocated heads at the grid ceilings okayed for cover.
|
FIR11-00486
| INSP-Sprinkler Rough-in | 9/13/2011 | 9/14/2011 | 9/14/2011 11:45:45 AM | A | PART |
|
|
Overhead work per the scope of permit approved for cover. Final pending ceiling finishes and escutcheons.
|
BLD11-01796
| FIRE-Final Inspection | 9/13/2011 | 9/14/2011 | 9/14/2011 11:44:08 AM | A | FAIL |
|
|
Correction items include; door hardware at the main entry/exit, post max. occupant load sign per conditions of attatched letter signed by the building official, fire sprinkler system modifications are necessary due to spacing issues and will require an FIR permit. See red-lined annotations on plan set.
|