Inspections for the day of: Friday, September 14, 2012.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00884 Site Preparation9/14/20129/14/20129/18/2012 3:18:56 PM PASS
ESC12-00153 General Inspection9/14/20129/14/20129/17/2012 3:06:35 PM PASS
ESC12-00251 General Inspection9/14/20129/14/20129/17/2012 2:23:49 PM PASS
ESC12-00930 Site Preparation9/14/20129/14/20129/17/2012 2:22:58 PM NR
ESC12-00912 Site Preparation9/13/20129/14/20129/17/2012 9:08:37 AMAPART
Verbal to RP:
Clean up the access on a daily basis.
ESC12-00916 Site Preparation9/14/20129/14/20129/17/2012 9:08:09 AM PASS
ESC12-00707 General Inspection9/14/20129/14/20129/17/2012 9:01:33 AM PASS
ESC12-00746 General Inspection9/14/20129/14/20129/14/2012 9:03:15 PM PASS
ESC12-00403 BMP Violation9/14/20129/14/20129/14/2012 9:02:41 PMPFAIL
STOP WORK ORDER
Per BMC 8-17, your site is in violation for discharging of turbid water offsite into the MS4 system. No discharges are allowed offsite.
**Stop work order will be lifted once ACHD has approved thatthe discharge meets the water quality standards besed upon the water quality of the Boise Riverabove the 9th street outfall. Not to exceed 25 NTU's based upon the Boise River. Must be proven by lab results. Not visual inspections. 25 NTU's is based over a 10 day continous dewatering. As stated in the Idaho DEQ 401 "Water quality standards" for constuctoin projects.

Will re-inspect once approval from ACHD is given. At the time that dewatering activities will begin, an inspector from either ACHD or City of Boise must be present to view the discharge before become active into the MS4 system.
MIS12-00259 ESC-Conference9/14/20129/14/20129/14/2012 8:48:02 PMPFAIL
STOP WORK ISSUED:
Working without active permits.
All work must cease after the first layer of asphalt is applied. If the second layer is placed prior to permits being issued, the contractor may be subjected to removing all new asphalt applied. Special site investigation fee will be applied to the fee's as well as the geeneral permitting fee's.
No work shall occur pass the authorized activities until all permits supporting the construction activies are paid in full and in an "Issued status.
ESC12-00360 Aging Inspection9/14/20129/14/20129/14/2012 2:17:15 PM PASS
ESC12-00921 DOC - Permit Finaled9/14/20129/14/20129/14/2012 2:02:59 PMPPASS
ESC12-00932 Site Preparation9/14/20129/14/20129/14/2012 9:28:17 AM PASS
ESC12-00778 Site Preparation9/14/20129/14/20129/14/2012 9:28:01 AM PASS
ESC12-00228 General Inspection9/14/20129/14/20129/14/2012 9:25:16 AM FAIL
Verbal to RP:
Must stabilize the the lot next to the project.
ESC12-01012 Stop Work Order9/14/20129/14/20129/14/2012 12:00:00 AMADONE
Working without permits