ELE15-02609
| Final | 9/11/2015 | 9/14/2015 | 9/14/2015 3:43:00 PM | P | FAIL |
|
|
John. Phone #: ###-#### Inspection requested via web by Sean DeLacy 250.32-buildings supplied by feeder shall have a grounding electrode installed. also see 250.50. 250.94-intersystem bonding busbar required for other systems at the disconnecting means for any buildings or structures. 550.16-install #8 bonding jumper between the 2 frames of modular unit. 110.16- arc flash warning label on loadcenter. NOTE:please provide access to main switchboard for final insp.
|
ELE15-01348
| Electrical Rough-In | 9/14/2015 | 9/14/2015 | 9/14/2015 2:54:38 PM | P | PASS |
|
|
Lvl 5, Zone 3 Phone #: ###-#### Inspection requested via web by Tom Betty r/i slab on deck ok
|
ELE12-02281
| Final | 9/1/2015 | 9/14/2015 | 9/14/2015 2:17:17 PM | P | FAIL |
|
|
Rudy-###-#### Clyde smart cell ###-#### 210.8(A)(7)- GFCI protection required within 6 foot of sinks. 210.12(A)- AFCI protection required in bdrms.(UPST). Garage: Install ground rod for subpanel at garage, ko seals in panel and covers on devices
|
ELE15-02899
| Final | 9/14/2015 | 9/14/2015 | 9/14/2015 1:03:29 PM | P | PASS |
|
|
call dave for info Phone #: ###-#### Inspection requested via web by Matt Phillips final ok
|
ELE13-03438
| Electrical Rough-In | 9/11/2015 | 9/14/2015 | 9/14/2015 10:17:11 AM | A | PASS |
|
|
Contact: Jeremiah Goins Phone #: ###-#### Inspection requested via web by Deb Gooden 4th floor r/i walls ok except conference rm, bathrooms and elevator lobby
|
ELE15-02799
| Electrical Rough-In | 9/11/2015 | 9/14/2015 | 9/14/2015 9:35:44 AM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by William Salts 2 j man on job now, checked cards. Not ready for r/i
|
ELE15-02912
| Final | 9/11/2015 | 9/14/2015 | 9/14/2015 9:15:12 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kelly Felin final ok
|
ELE15-02037
| Final | 9/13/2015 | 9/14/2015 | 9/14/2015 8:38:22 AM | A | PASS |
|
|
Dan Phone #: ###-#### Inspection requested via web by Dan Hobdey final ok
|