NAF15-00023
| INSP-Final | 9/14/2015 | 9/14/2015 | 9/14/2015 2:49:12 PM | P | PASS |
|
|
Inspection of two (2) sidewall sprinklers installed to cover two separate walk-in coolers.
|
FIR14-00792
| INSP-Sprinkler Rough-in | 9/14/2015 | 9/14/2015 | 9/14/2015 2:47:20 PM | P | PART |
|
|
Rough to cover inspection for Bldg. H basement. See plans for areas inspected this visit. NOTE: Two (2) SSU sprinklers located at the elevator lobby obstructed by grid mounted lighting units that exceeds 4ft in one dimension. Modify these sprinklers as needed, or remove the obstructions to these sprinklers.
|
FIR15-00643
| INSP-Final Inspection | 9/11/2015 | 9/14/2015 | 9/14/2015 12:17:40 PM | A | PASS |
|
|
Test of two (2) new stroe devices added in two new office spaces.
|
BLD15-01676
| FIRE-Final Inspection | 9/11/2015 | 9/14/2015 | 9/14/2015 12:16:25 PM | A | CANC |
|
|
FLS inspection not conducted due to discrepancies noted with the fire sprinkler system (see FIR 15-00504) for details.
|
FIR15-00504
| INSP-Final Inspection | 9/11/2015 | 9/14/2015 | 9/14/2015 12:14:46 PM | A | FAIL |
|
|
Two (2) sprinklers obstructed - one by surface mounted light fixture, and the other installed too close (within 3 in") of kitchen hood. Contractor agreed to address these discrepancies and call back for another final inspection.
|