ESC14-00759
| General Inspection | 9/14/2015 | 9/14/2015 | 9/15/2015 3:31:45 PM | | PASS |
|
|
revegetation, temporary BMPs still installed. BLD finaled and home occupied. No corrections issued
|
ESC13-00684
| General Inspection | 9/11/2015 | 9/14/2015 | 9/15/2015 1:34:51 PM | P | PASS |
|
|
Subdivision BMPs and perimeter containment are working effectively. No trackout or offsite dischages. SFHs in progress. See BMP violations for Dave Evans construction on ESC15-01019
|
ESC14-01166
| General Inspection | 9/14/2015 | 9/14/2015 | 9/15/2015 12:55:47 PM | | PASS |
|
|
Work complete, yard has been landscaped and street has been cleaned. Area under power lines used for access to backyard has been tacified and is vegetating. Native vegetation around home and in back half of yard has been preserved. Permit conditions satisfied.
|
ESC14-01011
| General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 4:28:09 PM | | CANC |
|
|
WIP. No inspection conducted. No issues observed based on recent inspection of area/Castello. Site has had good compliance.
|
ESC14-00544
| General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 4:26:54 PM | | PART |
|
|
Staging area still in use. No significant trackout but initial construction entrance material has been covered up/tracked out. Will need to install new entrance before wet weather to prevent trackout.
|
ESC14-00940
| Aging Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 2:26:35 PM | | CANC |
|
|
|
ESC15-00394
| DOC - Permit Finaled | 9/14/2015 | 9/14/2015 | 9/14/2015 2:22:47 PM | P | PASS |
|
|
|
ESC14-01131
| General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 2:21:35 PM | | CANC |
|
|
|
ESC14-00934
| Aging Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 2:16:47 PM | | PASS |
|
|
No activity on BLD since February. Permit sign still posted, no sediment leaving site. Some minor work ongoing by homeowner. No issues, no further ESC inspections necessary.
|
ESC14-00934
| DOC - Permit Finaled | 9/14/2015 | 9/14/2015 | 9/14/2015 2:15:12 PM | P | PASS |
|
|
|
ESC14-00658
| Aging Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 2:05:53 PM | | PASS |
|
|
WIP. Stormdrain on corner has sediment protection. Site is gated with materials contained, near completion. Permit sign posted. No corrections issued.
|
ESC14-00438
| General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 1:50:27 PM | | PEND |
|
|
Home complete but yard not stabilized or landscaped to completion. Hillside bond by PW has be obtained and is in effect till Oct. 26. Homeowner stated they are meeting with landscape architects this week to finalize plans and is also monitoring runoff from his property to make sure it is not cause erosion/sediment runoff. No issues observed.
|
ESC14-00299
| Conference | 9/14/2015 | 9/14/2015 | 9/14/2015 1:44:59 PM | P | PEND |
|
|
Initial corrections complete:
1. ESC permit sign posted 2. Street, sidewalk, and gutter are clean with storm drain installed with inlet bag. 3. Wattles installed at driveway edge and just above the retaining wall 4. Wire back silt fence brought to site (see correction below)
Remaining corrections: 1. Clean up concrete and stucco waste 2. Properly trench in silt fence. ESC BMP guidebook provided to Josh
Note : SWO lifted and permitted that SWO sticker be removed. Special Investigation fee issued (4 site visits in one week conducted)
|
ESC14-00299
| Site Preparation | 9/14/2015 | 9/14/2015 | 9/14/2015 1:38:02 PM | P | CANC |
|
|
|
ESC14-01063
| General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 12:33:25 PM | | PASS |
|
|
No activity at time of inspection. Stormwater features have been cleaned and temp BMPs reinstalled after large rain event earlier this summer. No corrections issued. Project is not yet complete.
|
ESC15-01075
| Site Preparation | 9/14/2015 | 9/14/2015 | 9/14/2015 12:32:00 PM | P | PASS |
|
|
Dave Phone #: ###-####
ESC permit sign posted, perimeter wattles installed, downstream DIs have sediment protection. Current Canyon Crest homes in Eyrie Canyon in compliance. Approved to excavate.
|
ESC15-00136
| DOC - Permit Finaled | 9/14/2015 | 9/14/2015 | 9/14/2015 12:05:18 PM | P | PASS |
|
|
|
ESC14-00865
| General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 11:41:08 AM | | PASS |
|
|
Work complete. Site cleaned and stabilized. ESC permit conditions satisfied.
|
ESC14-00865
| DOC - Permit Finaled | 9/14/2015 | 9/14/2015 | 9/14/2015 11:40:40 AM | P | PASS |
|
|
|
ESC14-01052
| General Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 11:33:24 AM | | CANC |
|
|
|
ESC14-01053
| Aging Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 11:21:32 AM | | CANC |
|
|
|
ESC13-01159
| Site Preparation | 9/11/2015 | 9/14/2015 | 9/14/2015 10:59:09 AM | P | PART |
|
|
Note - data entry error, not a site prep inspeciton. Pepper Mill sub is a developed project with SFHs in progress.
Trash contained at sites, individual permits posted, concrete washout pit was utilized, and subdivision storm drains have sediment bags.
Correction/Violation: litter from construction sites has accumulated along the walk way and ditch banks that border the site. Issued correction to pick up all litter. Mostly bottles, cans, cardboard boxes from building materials, and plastic wrappings.
|
ESC14-00432
| Site Preparation | 9/11/2015 | 9/14/2015 | 9/14/2015 10:38:04 AM | P | PASS |
|
|
note - not a site prep inspection. Active project.
WIP on Hayden Homes in Aralar Park sub. Vegetated buffer and silt fence protection of 5 mile Creek is working and construction is not disturbing banks. Newly installed neighborhood stormdrains have inlet protection that is being maintained. No significant litter issues, sediment trackout, and no complaints received. No corrections at this time.
|
ESC15-00544
| Random Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 10:29:58 AM | A | PASS |
|
|
WIP. See ESC15-00545 for Union Square Office Bldg #1
|
ESC15-00545
| Random Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 10:19:23 AM | P | PART |
|
|
WIP on frame for building shell. Site has been graded and utilities installed. No permanent stabilization yet, but no trackout, fugitive dust, or sediment runoff occuring.
Perimeter sediment control silt fence is properly trenched and keeping sediment on site to the south along Overland. All surrounding DIs have sediment bags installed. Permits and SWPPP information posted. Rock construction entrance installed at east end of site by active building work. West entrance has been filled in with dirt and currently open to use. Some minor trackout occuring.
1 correction: - Install stabilized entrance, restrict access, or provide schedule of paving/stabilization.
|
ESC14-00921
| Aging Inspection | 9/14/2015 | 9/14/2015 | 9/14/2015 9:25:19 AM | | PASS |
|
|
|