FIR16-00265
| INSP-Sprinkler Rough-in | 9/14/2016 | 9/14/2016 | 9/14/2016 2:26:00 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping located above soffits in VRT complete, overhead fire sprinkler piping located above soffits in VRT approved for cover.
|
FIR15-00727
| INSP-Sprinkler Rough-in | 9/9/2016 | 9/14/2016 | 9/14/2016 2:24:27 PM | P | CANC |
|
|
Inspection request for VRT, FIR16-00265. This inspection request cancelled and a new inspection request will be generated.
|
FIR16-00322
| INSP-Sprinkler Rough-in/Hydro | 9/13/2016 | 9/14/2016 | 9/14/2016 12:57:12 PM | A | PASS |
|
|
Hydrostatic test for overhead fire sprinkler piping located on levels 1, 2, 3 and 4 complete. Rough to cover inspection for overhead fire sprinkler piping complete, levels 1 and 2 approved for cover. Partial cover approved for level 3, fire sprinkler piping located in attic spaces cannot be covered until tenting inspection is complete, all of level 4 not approved for cover until tenting inspection is complete.
|
FIR13-00167
| INSP-Sprinkler Rough-in | 9/8/2016 | 9/14/2016 | 9/14/2016 11:13:34 AM | A | CANC |
|
|
Inspection request will be completed during hydrostatic testing per conversation with point of contact, Jeff phone number ###-####.
|
BLD14-02741
| FIRE-Sprinkler Rough-in | 9/13/2016 | 9/14/2016 | 9/14/2016 11:10:52 AM | A | DONE |
|
|
Request was for a life fire safety conference, fire conference complete.
|
BLD16-02323
| FIRE-Final Inspection | 9/13/2016 | 9/14/2016 | 9/14/2016 10:32:15 AM | A | CANC |
|
|
Spoke with point of contact, Gabe Beal Phone #: ###-####, records show that there is not an FIR permit associated with this projects fire alarm system. Before life fire safety inspection can be completed the fire alarm issue needs to be resolved. This inspection request cancelled per conversation with Gabe, inspection will be followed up after fire alarm permit is issued, fire alarms are inspected and inspection is passed.
|
FIR16-00456
| INSP-Sprinkler Rough-in/Hydro | 9/13/2016 | 9/14/2016 | 9/14/2016 10:23:10 AM | A | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping with new preaction system complete, overhead fire sprinkler piping approved for cover. 200 psi hydrostatic test for overhead fire sprinkler piping with new preation system complete.
|