ELE17-03065
| Conference | 9/14/2017 | 9/14/2017 | 9/14/2017 1:44:52 PM | P | PASS |
|
|
Seth Phone #: ###-####...
discussed current service, options getting power to new shed, max and min power requirement, wiring methods to shed and inside shed, disconnect at shed, min trench depth, and future inspection scheduling...qualified to do work...knowledgeable
|
ELE17-02543
| Final | 9/13/2017 | 9/14/2017 | 9/14/2017 12:23:16 PM | P | PASS |
|
|
Call Barry 1 hour in advance so he can meet you out there. No rough in was completed on this one. Phone #: ###-#### Inspection requested via web by Christian Kilpatrick...
labelling, ocpd, and disconnect...ok to final
|
ELE17-02543
| Electrical Rough-In | 9/14/2017 | 9/14/2017 | 9/14/2017 12:22:21 PM | P | PASS |
|
|
Call Barry 1 hour in advance so he can meet you out there. No rough in was completed on this one. Phone #: ###-#### Inspection requested via web by Christian Kilpatrick...
listed equipment used...visually verfied grounding of rails and ul listed inverters previous day...no panels installed at time...verified with contractor panels are listed by pictures...rough ok
|
ELE17-02998
| Final | 9/13/2017 | 9/14/2017 | 9/14/2017 10:02:35 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by jody mitchell...
not ready for final...needed perm service inspection
|
ELE17-02998
| Permanent Service | 9/14/2017 | 9/14/2017 | 9/14/2017 10:02:00 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by jody mitchell...
p/s u/g n ok
|
ELE17-02729
| Electrical Rough-In | 9/13/2017 | 9/14/2017 | 9/14/2017 9:07:51 AM | A | PASS |
|
|
Potting and equipotential Phone #: ###-#### Inspection requested via web by Kevin Koomler....ok
|
ELE17-03018
| Final | 9/13/2017 | 9/14/2017 | 9/14/2017 8:34:19 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Ron Zimmerman...
ok to final
|
ELE17-02427
| Final | 9/13/2017 | 9/14/2017 | 9/13/2017 12:21:12 PM | A | PASS |
|
|
garage code 2468 Phone #: ###-#### Inspection requested via web by Darryn Coburn...
ok to final
|