Inspections for the day of: Friday, September 14, 2018.
Number of inspections: 7
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM18-01935 Final9/13/20189/14/20189/14/2018 8:36:39 AMAFAIL
Phone #: ###-#### Inspection requested via web by Ann Marie Reyes I walked the first 6 units and they all needed an air gap at the water heater reilef line, provide airgaps at the relief lines and walk through the other 6 units to make sure they are ready for inspection.
PLM18-02795 Final9/13/20189/14/20189/14/2018 8:11:30 AMAPASS
call for code Phone #: ###-#### Inspection requested via web by Jason Gonzalez, talked to Jason about the water heater vent not being secured. he said the hvac contractor installed it so I added and failed a final inspection on the hvac permit and passed this inspection.
PLM18-03906 Sprinkler (Final)9/14/20189/14/20189/14/2018 8:09:14 AMAPASS
PLM18-03908 Sprinkler (Final)9/13/20189/14/20189/14/2018 8:08:56 AMAPASS
Nicolas Phone #: ###-####
PLM18-03907 Sprinkler (Final)9/13/20189/14/20189/14/2018 8:04:57 AMAPASS
Nicolas Phone #: ###-####
PLM18-03907 Sprinkler (Final)9/13/20189/14/20189/14/2018 8:04:42 AMAPASS
Nicolas Phone #: ###-####
MEC18-03301 Final9/14/20189/14/20189/14/2018 8:04:25 AMAFAIL
I added and failed the final here because the vent on the water heater is not secured to the water heater or the b-vent.