PLM17-04978
| PLM-Aging Inspection | 9/14/2018 | 9/14/2018 | 9/21/2018 4:05:18 PM | | NR |
|
|
con 2 sch
|
PLM18-03925
| Plumbing Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 3:48:42 PM | P | PASS |
|
|
Casey-call for access code Phone #: ###-####
|
PLM18-03704
| Plumbing Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 3:23:12 PM | P | PASS |
|
|
19934 Phone #: ###-#### Inspection requested via web by Ann Marie Reyes
|
PLM18-03887
| Final | 9/14/2018 | 9/14/2018 | 9/14/2018 3:04:27 PM | P | PASS |
|
|
Elderly couple. Allow time to get to door. They were home yesterday but couldn''t get to the door before you left. ###-#### Phone #: ###-#### Inspection requested via web by Mary LaFayette
|
PLM18-03901
| Water Heater Final | 9/13/2018 | 9/14/2018 | 9/14/2018 3:04:06 PM | P | PASS |
|
|
PLEASE CALL WHEN ON THE WAY. MARY-###-#### Phone #: ###-#### Inspection requested via web by Chris Field
|
PLM18-03902
| Sprinkler (Final) | 9/14/2018 | 9/14/2018 | 9/14/2018 2:29:13 PM | P | FAIL |
|
|
Stan Phone #: ###-####. Double check valves are not approved for sprinkler systems as of Jan 2018. Install a rp or pvb. Hard pipe above grade
|
PLM18-03814
| Plumbing Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 2:15:35 PM | P | PASS |
|
|
Justin (husband)-please call 30 minutes prior to meet Phone #: ###-####
|
PLM18-03923
| Groundwork | 9/14/2018 | 9/14/2018 | 9/14/2018 2:02:20 PM | P | PASS |
|
|
It''s ready, Please cal sell for access@###-#### Phone #: ###-#### Inspection requested via web by Semsudin Konjuhovac
|
PLM18-03904
| Plumbing Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 9:32:11 AM | A | NH |
|
|
Please call Ed with Stite to make sure home owner is there. Sometimes they are out back. His # is 208 941 2935. Thank you. Phone #: ###-#### Inspection requested via web by Troy Paulin
|
PLM18-03144
| Roof Drains | 9/13/2018 | 9/14/2018 | 9/14/2018 9:19:17 AM | A | PART |
|
|
and water lines Phone #: ###-#### Inspection requested via web by Raul Castanon. roof drains ok. Run an indirect waste from the roof top hydrant to an approved location
|
PLM18-03865
| Groundwork | 9/13/2018 | 9/14/2018 | 9/14/2018 8:50:32 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOBI WLSON
|