MIS18-00363
| BLD-Conference | 9/14/2018 | 9/14/2018 | 9/17/2018 2:35:40 PM | P | PEND |
|
|
Lori with EPA called-this is 1109 & 1111 is doing work w/o permits working off old permits
|
BLD18-02503
| BLD-Conference | 9/13/2018 | 9/14/2018 | 9/17/2018 6:15:13 AM | P | PASS |
|
|
Brian Phone #: ###-#### this was a framing inspection
|
BLD18-02674
| BLD-Framing/Rough-in | 9/14/2018 | 9/14/2018 | 9/17/2018 6:14:19 AM | P | PART |
|
|
Please call ahead for access, 1hr - Kurt Phone #: ###-#### ok to insulate needs point load tras in crawl space pads and post
|
BLD18-01688
| BLD-Final | 9/13/2018 | 9/14/2018 | 9/17/2018 6:11:48 AM | P | PASS |
|
|
Jason Phone #: ###-####
|
BLD18-00670
| BLD-Foundation | 9/14/2018 | 9/14/2018 | 9/14/2018 2:43:32 PM | P | PASS |
|
|
retaining walls // Alvaro Phone #: ###-####
|
BLD18-02777
| BLD-Foundation | 9/14/2018 | 9/14/2018 | 9/14/2018 2:19:47 PM | P | PASS |
|
|
Pouring at 2 - Trent Phone #: ###-####
|
BLD18-02777
| BLD-Footing | 9/14/2018 | 9/14/2018 | 9/14/2018 2:19:36 PM | P | PASS |
|
|
Trent Phone #: ###-####
|
BLD18-02387
| BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 1:38:30 PM | P | PASS |
|
|
Metal stud TI space 1st floor, Elec Insp already requested for am Friday. Phone #: ###-#### Inspection requested via web by Mark Steen
|
BLD18-02649
| BLD-Framing/Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 1:18:42 PM | P | PASS |
|
|
please call when on way if need him to be on site// John Engleman Phone #: ###-####
|
BLD18-01193
| BLD-Framing/Rough-in | 9/14/2018 | 9/14/2018 | 9/14/2018 12:53:06 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by kevin debelloy
|
BLD18-00792
| BLD-Other | 9/14/2018 | 9/14/2018 | 9/14/2018 12:41:27 PM | P | DONE |
|
|
Don-soffits Phone #: ###-####
|
BLD17-04351
| BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 12:41:09 PM | A | PASS |
|
|
Inspection is for exterior type x fire barriers Phone #: ###-#### Inspection requested via web by kevin debelloy
|
MIS18-00362
| BLD-Conference | 9/13/2018 | 9/14/2018 | 9/14/2018 12:40:36 PM | A | PASS |
|
|
no work that needs a permit
|
BLD17-04465
| BLD-Wall Bracing | 9/14/2018 | 9/14/2018 | 9/14/2018 11:36:47 AM | A | PART |
|
|
Exterior Shear inspection of 2nd ; 3rd floor walls soon to be concealed behind masonry pilasters between gridlines 10 and 6 Phone #: ###-#### Inspection requested via web by Hunter Gomez
|
BLD18-01876
| BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 11:36:27 AM | A | NR |
|
|
Chris Phone #: ###-#### needs air seal and strape top plates ok to spray foam
|
BLD18-01731
| BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 8:54:42 AM | A | PASS |
|
|
call before to meet // Will Mitchell Phone #: ###-#### ok to insulate needs to add studs uner three ply trusses and roll block high truss heals
|
BLD17-04413
| BLD-Foundation | 9/13/2018 | 9/14/2018 | 9/14/2018 8:53:54 AM | A | CANC |
|
|
Masonry Rebar inspection for C5 in Centennial site Phone #: ###-#### >> Inspection requested via web by Brandon Reynolds Inspection cancelled from web by: Brandon Reynolds
|
BLD18-02380
| BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 8:36:17 AM | A | CANC |
|
|
Phone #: ###-#### >> Inspection requested via web by kevin debelloy Inspection cancelled from web by: kevin debelloy
|
BLD18-02190
| DOC - Permit Finaled | 9/14/2018 | 9/14/2018 | 9/14/2018 8:25:30 AM | P | PASS |
|
|
|
BLD18-01896
| BLD-Framing/Rough-in | 9/13/2018 | 9/14/2018 | 9/14/2018 8:19:07 AM | A | PASS |
|
|
George Phone #: ###-#### needs to install fire place
|
BLD17-02305
| BLD-Energy code compliance | 9/13/2018 | 9/14/2018 | 9/14/2018 8:18:26 AM | A | PASS |
|
|
Roger Phone #: ###-####
|