Inspections for the day of: Tuesday, September 15, 1998.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJack Frank
TitleELE-INSPECTOR
Phone #794-1930
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE98-02414 INSP - Final9/15/19989/15/19989/15/1998 12:00:00 AMAPASS
09/15/98 315 - Scheduled by Hello!. Contact phone is [8666082]. ok
ELE96-02758 INSP - Electrical Rough-In9/14/19989/15/19989/15/1998 12:00:00 AMAFAIL
09/14/98 315 - KEVIN ###-#### ..trans jms.. cor. posted and not ready is a mess nothing is done to meet NEC
ELE98-03163 INSP - Electrical Rough-In9/14/19989/15/19989/15/1998 12:00:00 AMAFAIL
09/15/98 315 - WADE ###-#### cor posted needs 20 amp circuit for new ba states
ELE98-03168 INSP - Electrical Rough-In9/14/19989/15/19989/15/1998 12:00:00 AMAFAIL
09/14/98 315 - JERRI ###-#### POOL BONDING INSP ..trans jms.. fail not ready
ELE98-01070 INSP - Final9/15/19989/15/19989/15/1998 12:00:00 AMPPASS
09/15/98 315 - JOE ###-#### EXT.1541 AFTER THE TONE ok
ELE98-01544 INSP - Electrical Rough-In9/15/19989/15/19989/15/1998 12:00:00 AMPPART
09/15/98 315 - Scheduled by Hello!. Contact phone is [8532968]. r/i ok 1st and 2nd floor part.
ELE98-02615 INSP - Final9/15/19989/15/19989/15/1998 12:00:00 AMPPASS
09/15/98 315 - steve ###-#### ..trans jms.. ok
ELE98-02660 INSP - Final9/15/19989/15/19989/15/1998 12:00:00 AMPPASS
09/15/98 315 - steve ###-#### ok
ELE98-03107 INSP - Final9/15/19989/15/19989/15/1998 12:00:00 AMPFAIL
09/15/98 315 - tom ###-#### ..trans jms.. fail and nalc called contractor