PLM03-02868
| Plumbing Rough-in | 9/15/2003 | 9/15/2003 | 9/15/2003 12:00:00 AM | P | PASS |
|
|
david ###-####
|
PLM03-02440
| Plumbing Rough-in | 9/15/2003 | 9/15/2003 | 9/15/2003 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 9/15/2003 at 8:53:22 AM. Contact: ###-####.cxc 9/15/2003 9:42:54 AM four fixture units on 1 1/2 inch line 9/15/2003 3:09:14 PM
|