Inspections for the day of: Wednesday, September 15, 2004.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRick Jackson
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00350 FIR-Aging Inspection9/15/20049/15/20049/15/2004 12:00:00 AM PASS
Still under construction 9/15/2004 10:14:25 AM
MIS04-00058 MIS-Aging Inspection9/15/20049/15/20049/15/2004 12:00:00 AM FAIL
extinguisher; sign above door 9/15/2004 2:36:41 PM
BLD03-02673 FIRE-Final Inspection9/14/20049/15/20049/15/2004 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/14/2004 at 1:37:30 PM. Contact: ###-####. THey will have the south door hardware for structural inspector 9/15/2004 10:09:19 AM
BLD04-01656 FIRE-Final Inspection9/14/20049/15/20049/15/2004 12:00:00 AMAFAIL
john; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Three sets of sprinkler heads are too close (within 6 ft of each other) 9/15/2004 2:48:50 PM
FIR01-00436 INSP-Final Inspection9/14/20049/15/20049/15/2004 12:00:00 AMAFAIL
bryan; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles Need updated, rated door on shaft and resubmittals 9/15/2004 10:08:10 AM
BLD04-00429 FIRE-Final Inspection9/15/20049/15/20049/15/2004 12:00:00 AMAPASS
FIR04-00283 INSP-Final Inspection9/15/20049/15/20049/15/2004 12:00:00 AMAPASS
BLD04-00101 FIRE-Final Inspection9/15/20049/15/20049/15/2004 12:00:00 AMPNR
robert; Phone #: ###-#### Internet Inspection Request from: Barbara Moore Awaiting 1-4 floor alarm plan upgrade to be completed 9/15/2004 4:59:42 PM
FIR02-00005 INSP-Sprinkler Rough-in/Hydro9/15/20049/15/20049/15/2004 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/15/2004 at 8:42:06 AM. Contact: ###-####. ^ inch main from pump room to concourse B hydro only okay 9/15/2004 2:35:24 PM