FIR06-00375
| INSP-Sprinkler Rough-in | 9/15/2006 | 9/15/2006 | 9/15/2006 4:14:11 PM | P | PASS |
|
|
The sprinkler piping above the hardlids on the second floor are ok to cover. This includes the hardlid 1/3 of the way up the north facing stairs.
|
FIR06-00663
| INSP-Final Inspection | 9/15/2006 | 9/15/2006 | 9/15/2006 4:12:57 PM | P | PASS |
|
|
Permit finaled
|
BLD05-01394
| FIRE-Final Inspection | 9/15/2006 | 9/15/2006 | 9/15/2006 12:35:53 PM | P | PASS |
|
|
Life safety finaled
|
FIR06-00218
| INSP-Final Inspection | 9/13/2006 | 9/15/2006 | 9/15/2006 12:35:26 PM | A | PASS |
|
|
Permit finaled
|
FIR05-00799
| INSP-Final Inspection | 9/15/2006 | 9/15/2006 | 9/15/2006 12:19:24 PM | P | PART |
|
|
A temporary occupancy was given until the phase II (remodeled existing area) is complete. The new FMC building is complete.
|
BLD05-00633
| FIRE-Final Inspection | 9/15/2006 | 9/15/2006 | 9/15/2006 12:16:43 PM | P | PART |
|
|
A temporary occupancy was given for the basement mech. room. See history for FIR05-00633
|
BLD05-02192
| BLD-Aging Inspection | 9/15/2006 | 9/15/2006 | 9/15/2006 10:25:10 AM | | NR |
|
|
work is in progress
|
BLD06-01401
| FIRE-Final Inspection | 9/14/2006 | 9/15/2006 | 9/15/2006 9:02:49 AM | A | PASS |
|
|
Life safety finaled.
|
FIR06-00168
| INSP-Sprinkler Rough-in | 9/13/2006 | 9/15/2006 | 9/15/2006 8:17:21 AM | A | CANC |
|
|
Wrong inspection number called in. I spoke with Todd about having the correct permit number called in for the work being inspected.
|
MIS06-00245
| FIR-Final | 9/14/2006 | 9/15/2006 | 9/15/2006 8:16:08 AM | A | FAIL |
|
|
No access and no contact phone number. No inspection performed.
|