FIR07-01051
| INSP-Sprinkler Rough-in/Hydro | 9/15/2008 | 9/15/2008 | 9/15/2008 4:36:23 PM | P | CANC |
|
|
Phone #: ###-####
|
BLD08-01294
| FIRE-Conference | 9/15/2008 | 9/15/2008 | 9/15/2008 4:19:25 PM | P | DONE |
|
|
Fire life safety conference, Conrad Phone #: ###-####
|
FIR08-00598
| INSP-Final Inspection | 9/15/2008 | 9/15/2008 | 9/15/2008 3:07:38 PM | P | CANC |
|
|
Forrest, Could we schedule this inspection for 3:00 or later? That is when school gets out. Thank you. Phone #: ###-#### Internet Inspection Request from: Jason Minnick Inspection cancelled from web by: Jason Minnick
|
FIR08-00597
| INSP-Sprinkler Rough-in/Hydro | 9/15/2008 | 9/15/2008 | 9/15/2008 1:15:32 PM | A | PART |
|
|
See stamped plan set for locations approved to date.
|
BLD08-01576
| FIRE-Final Inspection | 9/15/2008 | 9/15/2008 | 9/15/2008 1:12:54 PM | A | PASS |
|
|
Life safety finaled.
|
FIR08-00433
| INSP-Sprinkler Rough-in/Hydro | 9/15/2008 | 9/15/2008 | 9/15/2008 1:12:12 PM | A | PART |
|
|
UG supply line okayed for cover.
|
FIR08-00517
| INSP-Sprinkler Rough-in/Hydro | 9/12/2008 | 9/15/2008 | 9/15/2008 1:11:22 PM | A | PART |
|
|
4th floor overhead fire sprinkler work is approved for cover at the drop ceilings.
|
FIR08-00281
| INSP-Conference | 9/12/2008 | 9/15/2008 | 9/15/2008 1:10:26 PM | A | DONE |
|
|
Craig with CM company will the person you will be meeting with. Thanks Phone #: ###-#### Internet Inspection Request from: Stan Beus
|