Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC08-00578 Tracking Control9/15/20089/15/20089/15/2008 4:23:56 PMPPASS
ESC08-00178 General Inspection9/15/20089/15/20089/15/2008 3:32:31 PMPPART
Minor tracking off onto Jefferson. No worries.
ESC08-00728 Site Preparation9/15/20089/15/20089/15/2008 2:47:29 PMPPASS
Discussed with the RP over issue that will be coming up with the project. He explained to me over all perventitave measures that will be taken.
CAS
ESC08-00728 Site Preparation9/12/20089/15/20089/15/2008 2:40:35 PMPNR
ESC06-00390 Site Final9/15/20089/15/20089/15/2008 2:27:57 PMPPASS
ESC06-00389 Site Final9/15/20089/15/20089/15/2008 2:27:39 PMPPASS

ESC06-00388 Site Final9/15/20089/15/20089/15/2008 2:27:22 PMPPASS
ESC06-00387 Site Final9/15/20089/15/20089/15/2008 2:27:08 PMPPASS

ESC08-00223 Random Inspection9/15/20089/15/20089/15/2008 2:13:47 PMPDONE
ESC06-00368 Site Final9/15/20089/15/20089/15/2008 2:08:11 PMPPASS
ESC06-00378 Site Final9/15/20089/15/20089/15/2008 2:03:48 PMPPASS
ESC06-01078 General Inspection9/15/20089/15/20089/15/2008 1:53:45 PMPFAIL
Need to clean up all sediment off of all hardsurfaces throughout the development.
ESC08-00532 BMP Violation9/11/20089/15/20089/15/2008 11:15:34 AMADONE
Work has not begun. The issues on the prior inspection was a Idaho power maintenance work. The project is just starting to get set up today. Will do a site preperation inspection on 9/17/08.
CAS
ESC08-00782 Site Preparation9/15/20089/15/20089/15/2008 10:49:58 AMAPASS
Stop work order has been pulled. All storm drain inlets are protected and ESC sign is posted.
CAS
ESC08-00183 BMP Violation9/15/20089/15/20089/15/2008 9:55:16 AMAFAIL
Verbal Notice. Spoke with the RP over the pertaining issues. Told RP to have all issues corrected by 9/19/08.
1. put in perimeter control where need that lots slope towards street.
2. Protect stock pile with erosion control or a sediment barrier.
3. Get approved storm drain protection in the interior storm drain of the project. Clean up all sediment and debris off of all hardsurfaces.
Will re-inspect on 9/19/08
ESC08-00406 Random Inspection9/15/20089/15/20089/15/2008 9:24:20 AMAFAIL
Need to clean up all debris at the lot. Remove or place in your trash container.
CAS