ESC09-00352
| General Inspection | 9/11/2009 | 9/15/2009 | 9/15/2009 3:24:09 PM | P | PART |
|
|
Marianne Williams Parks meeting @ 2:30. At the meeting discussed the need to install rock stabilized entrance on west side of project. Gate is installed but remains open. Ok to continue with sweeping until bridge is open and bridge contractor has trailer removed at which time gate to be locked and other controls in place to prevent vehicle traffic around the gate. Vehicle traffic to use stabilzed entrance on the north side of the project.
|
ESC09-00507
| Conference | 9/14/2009 | 9/15/2009 | 9/15/2009 3:21:13 PM | A | PART |
|
|
1:30pm: Met with contractor, RP and ACHD. Reviewed project. Provided overview of slope stabilization including the need for BFM sooner rather than later to reduce turbid runoff and for slope stabilization.
|
ESC09-00164
| Site Final | 7/15/2009 | 9/15/2009 | 9/15/2009 9:42:39 AM | P | CANC |
|
|
Already finaled
|
ESC09-00550
| Conference | 9/14/2009 | 9/15/2009 | 9/15/2009 7:43:56 AM | P | CANC |
|
|
2:00 with Clint.
|