PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Tuesday, September 15, 2009
.
Number of inspections:
8
Percentage of inspections complete:
88 %
Percentage of inspections not complete:
13 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC09-00558
Site Preparation ESC
9/15/2009
9/15/2009
9/15/2009 4:07:40 PM
PASS
ESC09-00203
Site Preparation
9/15/2009
9/15/2009
9/15/2009 3:49:51 PM
PART
Verbal to RP:
Street washing is only allowed after a street sweeper has completed its pass.
ESC09-00507
Conference
9/14/2009
9/15/2009
9/15/2009 2:10:00 PM
P
DONE
WEnt over the recommendation pertaining with hydro-seeding to B.F.M application on the slope for a more duraible bonding hold.
ESC07-00987
Site Final
9/15/2009
9/15/2009
9/15/2009 11:31:20 AM
A
PASS
ESC09-00572
Site Preparation
9/15/2009
9/15/2009
9/15/2009 9:55:11 AM
NR
ESC09-00507
BMP Violation
9/15/2009
9/15/2009
9/15/2009 9:48:57 AM
A
PASS
All issues corrected. Keeping up with sediment street sweeping prior to loading of the trucks and pups.
ESC09-00352
General Inspection
9/15/2009
9/15/2009
9/15/2009 9:30:50 AM
A
PART
Verbal to RP:
At the access point along the park center bridge, it is required to stabilize with an approved construction entrance or block off with some type of barrier.
ESC07-01486
General Inspection
6/8/2009
9/15/2009
A
Winterization.