Inspections for the day of: Monday, September 15, 2014.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRock A. Hudson
TitleELE-INSPECTOR
Phone #794-6794
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE14-02034 Final9/15/20149/15/20149/15/2014 2:42:35 PMPPASS
Josh Phone #: ###-#### or ###-#### Jennifer Final ok
ELE14-02350 Electrical Rough-In9/15/20149/15/20149/15/2014 2:30:22 PMPPASS
Best access is from the alley Phone #: ###-#### Inspection requested via web by Brad Girard Basement to remain unfinished for future finish. contractor to support over head to shed to provide clearance from new window. Main floor back bath and stair rough in ok cover
ELE14-02361 Electrical Rough-In9/15/20149/15/20149/15/2014 1:39:22 PMPPASS
Steve Hook is contact at ###-####. thank you, underground. AM if you can get there sooner. Phone #: ###-#### Inspection requested via web by Debby Pierce South light poles and underground for north east poles and south poles and to gate rough in ok cover
ELE14-01194 Final9/15/20149/15/20149/15/2014 12:54:27 PMPPASS
Phone #: ###-#### Inspection requested via web by TOM BICANDI Final ok
ELE14-02213 Electrical Rough-In9/15/20149/15/20149/15/2014 12:18:10 PMPPASS
Underground - Mike Phone #: ###-#### Floor boxes, fiber conduits, sign conduits rough in ok cover
ELE14-02283 Electrical Rough-In9/14/20149/15/20149/15/2014 11:37:48 AMAPASS
access is front door lock box 2468 Phone #: ###-#### Inspection requested via web by Charles Davis Kitchen only walls opened completely up, numerous 2 wire circuits still exsist. Rough in ok cover
ELE14-01191 Electrical Rough-In9/12/20149/15/20149/15/2014 10:59:16 AMAPASS
Mark-woluld like later in the AM if posssible Phone #: ###-#### Clamping connector shall be installed on back of meter for SER entrance to can. Addition rough in ok cover
GCE13-00191 GCE-Final9/12/20149/15/20149/15/2014 10:23:57 AMAPART
Don ###-#### final for kitchen and hallway GFCI protection needed on recepticals in laundry with in 6' of sink, drinking fountain in main entrance, and main bath recepticals. Switch covers in theater area. Halls A, B, C, D, all main offices and great room or dining area Final ok
ELE14-02056 Final9/14/20149/15/20149/15/2014 9:38:08 AMAPASS
Phone #: ###-#### Inspection requested via web by BARRY KENDALL Final ok
GCE14-00148 GCE-Temporary Service9/12/20149/15/20149/15/2014 9:01:53 AMAFAIL
Ed ###-#### temp pole 110.12 Mechanical Execution of Work. Electrical equipment
shall be installed in a neat and workmanlike manner. B) Integrity of Electrical Equipment and Connections.
Internal parts of electrical equipment, including busbars,
wiring terminals, insulators, and other surfaces, shall not be
damaged or contaminated by foreign materials.