ELE14-02034
| Final | 9/15/2014 | 9/15/2014 | 9/15/2014 2:42:35 PM | P | PASS |
|
|
Josh Phone #: ###-#### or ###-#### Jennifer Final ok
|
ELE14-02350
| Electrical Rough-In | 9/15/2014 | 9/15/2014 | 9/15/2014 2:30:22 PM | P | PASS |
|
|
Best access is from the alley Phone #: ###-#### Inspection requested via web by Brad Girard Basement to remain unfinished for future finish. contractor to support over head to shed to provide clearance from new window. Main floor back bath and stair rough in ok cover
|
ELE14-02361
| Electrical Rough-In | 9/15/2014 | 9/15/2014 | 9/15/2014 1:39:22 PM | P | PASS |
|
|
Steve Hook is contact at ###-####. thank you, underground. AM if you can get there sooner. Phone #: ###-#### Inspection requested via web by Debby Pierce South light poles and underground for north east poles and south poles and to gate rough in ok cover
|
ELE14-01194
| Final | 9/15/2014 | 9/15/2014 | 9/15/2014 12:54:27 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by TOM BICANDI Final ok
|
ELE14-02213
| Electrical Rough-In | 9/15/2014 | 9/15/2014 | 9/15/2014 12:18:10 PM | P | PASS |
|
|
Underground - Mike Phone #: ###-#### Floor boxes, fiber conduits, sign conduits rough in ok cover
|
ELE14-02283
| Electrical Rough-In | 9/14/2014 | 9/15/2014 | 9/15/2014 11:37:48 AM | A | PASS |
|
|
access is front door lock box 2468 Phone #: ###-#### Inspection requested via web by Charles Davis Kitchen only walls opened completely up, numerous 2 wire circuits still exsist. Rough in ok cover
|
ELE14-01191
| Electrical Rough-In | 9/12/2014 | 9/15/2014 | 9/15/2014 10:59:16 AM | A | PASS |
|
|
Mark-woluld like later in the AM if posssible Phone #: ###-#### Clamping connector shall be installed on back of meter for SER entrance to can. Addition rough in ok cover
|
GCE13-00191
| GCE-Final | 9/12/2014 | 9/15/2014 | 9/15/2014 10:23:57 AM | A | PART |
|
|
Don ###-#### final for kitchen and hallway GFCI protection needed on recepticals in laundry with in 6' of sink, drinking fountain in main entrance, and main bath recepticals. Switch covers in theater area. Halls A, B, C, D, all main offices and great room or dining area Final ok
|
ELE14-02056
| Final | 9/14/2014 | 9/15/2014 | 9/15/2014 9:38:08 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by BARRY KENDALL Final ok
|
GCE14-00148
| GCE-Temporary Service | 9/12/2014 | 9/15/2014 | 9/15/2014 9:01:53 AM | A | FAIL |
|
|
Ed ###-#### temp pole 110.12 Mechanical Execution of Work. Electrical equipment shall be installed in a neat and workmanlike manner. B) Integrity of Electrical Equipment and Connections. Internal parts of electrical equipment, including busbars, wiring terminals, insulators, and other surfaces, shall not be damaged or contaminated by foreign materials.
|