ESC13-00125
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 4:16:41 PM | | PASS |
|
|
|
ESC14-00868
| Site Preparation | 9/15/2014 | 9/15/2014 | 9/15/2014 3:47:05 PM | P | PASS |
|
|
site prep for sewer line project a long Greenbelt and Warm Springs....
Most project is on the roadway. At confluence of Parkcent and Warm Springs, silt fence and a series or wattles have been installed properly.
Will continue to monitor as they get closer to the east end of project. Approved.
|
ESC13-00396
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 2:57:48 PM | | PASS |
|
|
Depot Lofts' buildings are complete, common areas landscaped. Some BLD permits for project are open, so will continue to inspect at this time. There is some demolition of old structures on adjacent lot that I needs investigation.
|
ESC13-00595
| Aging Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 2:36:25 PM | | PASS |
|
|
No activity on BLD permit since December 2013. ESC permit expired. No outstanding issues or corrections needed at site. Stockpile in front of home is now vegetated/stabilized and no sediment leaving site.
|
ESC13-00595
| DOC - Permit Finaled | 9/15/2014 | 9/15/2014 | 9/15/2014 2:33:31 PM | P | PASS |
|
|
|
ESC14-00887
| Site Preparation | 9/15/2014 | 9/15/2014 | 9/15/2014 2:06:16 PM | P | PASS |
|
|
call before // Stephen Fitzpatrick Phone #: ###-####
Discussed project with RP Stephen; small, low risk home improvement. No MS4 or surface water adajacent to site. Permit is posted in alley next to project area.
Approved.
|
ESC13-00552
| BMP Violation | 9/12/2014 | 9/15/2014 | 9/15/2014 12:40:40 PM | A | DONE |
|
|
Need to replace concrete washout.
Call RPs of Eaglewood (Adam) and Hayden to have new washout provided for next series of houses. Also called developer Brad to alert that a new washout is needed. Will check back later this week...
|
ESC12-00539
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 12:17:28 PM | | PASS |
|
|
Scope of work on phase DH estates #8-9 is complete, but construction materials and stockpiles are still present and adajacent to new phase #12 construction.
No trackout or improper material storage observed.
ACHD sweeper was onsite doing routine sweeping. (unrelated)
|
ESC13-00199
| Aging Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 12:15:19 PM | | PASS |
|
|
All infrastructure and streets for Dallas Harris Estates phase 11 is complete with most parcels occupied or in progress with Tahoe Homes - all covered with sepearte ESC permits.
|
ESC13-00199
| DOC - Permit Finaled | 9/15/2014 | 9/15/2014 | 9/15/2014 12:14:02 PM | P | PASS |
|
|
|
ESC13-00344
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 12:05:37 PM | | PEND |
|
|
BH #5 no ESC issues or violations observed at time of inspection.
Still need to install check dams on top of Windsong before wet season. Checking with RP to find out schedule.
|
ESC13-00690
| Aging Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 11:27:32 AM | | PASS |
|
|
Barrow sub BMPs installed. Home in progress. No corrections at this time. Silt fence and vegetated buffer below site is containing sediment.
|
ESC13-00707
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 11:27:18 AM | | PASS |
|
|
Barrow sub BMPs installed. Home in progress. No corrections at this time. Silt fence and vegetated buffer below site is containing sediment.
|
ESC13-00520
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 11:26:15 AM | | PEND |
|
|
Home is near completion with landscaping, sod placement and retaining walls complete. BLD permit is still open.
The area between yard and downslope silt fence will have rills raked out and the area hydroseeded.
Silt fence will stay installed until slope stabilization. Will continue to monitor. No significant trackout or issues on street.
|
ESC13-00764
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 11:08:35 AM | | PASS |
|
|
No activity at Eyrie Canyon #7 phase at time of inspection. Bent Bow is in good condition; hillsides behind parcels are well vegetated.
No corrections necessary at time. Will keep montioring hillside conditions for upcoming wet season.
|
ESC14-00469
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 10:09:28 AM | P | PASS |
|
|
WIP. Construction entrance and DI protection is installed. No trackfout or nonstormwater discharges from site. Permit is posted. Approved.
|
ESC12-01166
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 10:08:14 AM | | PASS |
|
|
Emerald Station commercial sub rough grading and infrastructure installation is complete. The area is now the site of new St. Al's joint prevention center which is in progress under ESC14-00469.
ESC permit conditions satisfied.
|
ESC12-01166
| DOC - Permit Finaled | 9/15/2014 | 9/15/2014 | 9/15/2014 10:06:03 AM | P | PASS |
|
|
|
ESC13-00752
| DOC - Permit Finaled | 9/15/2014 | 9/15/2014 | 9/15/2014 9:51:37 AM | A | PASS |
|
|
Completed Pine Tree Village townhome. ESC permit conditions satisfied.
|
ESC13-01213
| DOC - Permit Finaled | 9/15/2014 | 9/15/2014 | 9/15/2014 9:50:37 AM | P | PASS |
|
|
Completed Pine Tree Village townhome. ESC permit conditions satisfied.
|
ESC13-01214
| DOC - Permit Finaled | 9/15/2014 | 9/15/2014 | 9/15/2014 9:49:34 AM | A | PASS |
|
|
Completed Pine Tree Village townhome. ESC permit condition satisfied.
|
ESC13-00750
| Aging Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 9:44:23 AM | | PASS |
|
|
Pinetree Village townhome is complete, landscaped, and area has been cleaned of sediment and construction materials. No violations observed in new phases. Permit finaled.
|
ESC13-00750
| DOC - Permit Finaled | 9/15/2014 | 9/15/2014 | 9/15/2014 9:43:12 AM | P | PASS |
|
|
|
ESC12-00206
| Aging Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 9:35:11 AM | | PASS |
|
|
Frazier place sub has about 60% parcels complete. Preece street and alley are free of sediment runoff or trackout. Stormdrains protected and trash and building materials are contained. Permits posted.
Approved.
|
ESC13-00655
| General Inspection | 9/12/2014 | 9/15/2014 | 9/15/2014 9:22:28 AM | A | PASS |
|
|
Aberdeen Square sub is in process of completing final phases of 4-plexes in the older section and installing new utilities & roads for new section on Raymond/Colehaven.
Streets appears to have been swept this weekend while contractors were gone. Permits are posted throughout site, no trackout and more rock is availabe on site to refresh vehicle tracking pads as needed.
No corrections at this time.
|
ESC13-00710
| General Inspection | 9/15/2014 | 9/15/2014 | 9/15/2014 8:41:16 AM | | PASS |
|
|
WIP. No trackout, spills, or other issues observed. The frame is up for warehouse, stormwater structures have BMP protection.
|