ESC15-01133
| Site Preparation | 9/14/2015 | 9/15/2015 | 9/15/2015 4:58:37 PM | P | PASS |
|
|
Project will begin. No BMP installations due to site, but will check initial progress for any potential issues..
WIP. Permit sign posted on Washington Street. Sidewalk, grass, and curb to be undisturbed. Staging in parking lot on north side of church. Workers keeping asphalt clean. No discharges or issues observed. Approved.
|
ESC15-00268
| Aging Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 4:56:42 PM | | CANC |
|
|
|
ESC14-00588
| General Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 4:54:40 PM | | CANC |
|
|
rescheduled
|
ESC14-01059
| Conference | 9/15/2015 | 9/15/2015 | 9/15/2015 4:46:21 PM | P | PASS |
|
|
conference to review BMPs for next phase requested by Buzz 4 PM
Existing asphalt entrance from Boise Avenue will remain. MS4 near entrance is above grade from site drainage area and is large crate. Sediment protection will be regular sweeping of the existing asphalt used as construction entrance. On site storm drains are to be demolished and replaced by permeable pavers in a later phase. During construction water ponds on site and infiltrates in the sandy material.
Approved. WIP. Provided new ESC permit sign, old one got wet/faded
Concrete washouts
|
ESC14-00747
| General Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 3:55:32 PM | | PASS |
|
|
Project complete, ongoing work on seperate greeenhouse is covered under ESC15 -00412. No sediment trackout, discharges, or fugitive dust at site. This permit finaled.
|
ESC14-00747
| DOC - Permit Finaled | 9/15/2015 | 9/15/2015 | 9/15/2015 3:52:24 PM | P | PASS |
|
|
|
ESC14-00462
| General Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 3:13:23 PM | | PASS |
|
|
|
ESC15-01158
| Site Preparation | 9/11/2015 | 9/15/2015 | 9/15/2015 3:07:13 PM | P | PASS |
|
|
Erin// please call before Phone #: ###-####
Accessory dwelling unit located within landscaped backyard of house with gravel driveway. Low risk. Informed homeonwner RP of ESC conditions. Approved to start.
|
ESC15-01038
| Site Preparation | 9/15/2015 | 9/15/2015 | 9/15/2015 1:59:47 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. DIs have inlet protection, designated concrete washouts on the open block to the east of active block. Tahoe projects currently in compliance.
|
ESC15-00650
| Site Preparation | 9/15/2015 | 9/15/2015 | 9/15/2015 1:59:30 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit sign posted. DIs have inlet protection, designated concrete washouts on the open block to the east of active block. Tahoe projects currently in compliance.
|
ESC15-01019
| BMP Violation | 9/15/2015 | 9/15/2015 | 9/15/2015 1:50:22 PM | P | FAIL |
|
|
Verbal CN issued to RP Matt:
1. Clean up gutter and sidewalk in front to ZEC projects on Parsnip 2. Post yellow permit sign identifying the 2 projects 3. Clean up washout dumped on adjacent lots. I reminded him of ordinance clause to contain washout on site and dispose properly.
Matt stated he will get the corrections made ASAP and was on site. Will check back later in week
|
ESC15-00959
| BMP Violation | 9/15/2015 | 9/15/2015 | 9/15/2015 1:50:07 PM | P | FAIL |
|
|
Verbal CN issued to RP Matt:
1. Clean up gutter and sidewalk in front to ZEC projects on Parsnip 2. Post yellow permit sign identifying the 2 projects 3. Clean up washout dumped on adjacent lots. I reminded him of ordinance clause to contain washout on site and dispose properly.
Matt stated he will get the corrections made ASAP and was on site. Will check back later in week
|
ESC14-01166
| DOC - Permit Finaled | 9/15/2015 | 9/15/2015 | 9/15/2015 12:52:29 PM | P | PASS |
|
|
|
ESC13-01279
| General Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 12:11:52 PM | | PASS |
|
|
WIP on homes at sound end of project. BMPs include DI bags, designated washout, and restricted access to open areas to prevent tracking. No discharges, dust, or other violations observed. No corrections at this time.
|
ESC12-00130
| Site Final | 9/15/2015 | 9/15/2015 | 9/15/2015 11:48:40 AM | P | PEND |
|
|
Check for remaining work for permit to be finaled:
Some site work is occuring on the west and northwest corner of the River Edge complex. All other areas have been cleaned, stabilized, and grassy drainage swales hydro seeded. Silt fence BMP installed along Greenbelt has been removed.
Staging area is still in use for remaining work. No trackout or discharges observed. DI bags on north side Royal Street will remian until project completion.
No corrections issued.
|
ESC15-00060
| Aging Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 11:41:17 AM | | PASS |
|
|
Townhome complete, yard landscaped. Lots used behind for staging covered under Mill District Square permit. Several more townhome lots to complete on Mill Station so DI bag on Mill Station and Eckert can remain. Permit finaled.
|
ESC15-00060
| DOC - Permit Finaled | 9/15/2015 | 9/15/2015 | 9/15/2015 11:40:50 AM | P | PASS |
|
|
|
ESC15-00061
| Aging Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 11:40:31 AM | | PASS |
|
|
Townhome complete, yard landscaped. Lots used behind for staging covered under Mill District Square permit. Several more townhome lots to complete on Mill Station so DI bag on Mill Station and Eckert can remain. Permit finaled.
|
ESC15-00061
| DOC - Permit Finaled | 9/15/2015 | 9/15/2015 | 9/15/2015 11:38:18 AM | P | PASS |
|
|
|
ESC14-00328
| General Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 11:12:32 AM | | CANC |
|
|
|
ESC15-00212
| Site Final | 9/14/2015 | 9/15/2015 | 9/15/2015 11:12:20 AM | A | PASS |
|
|
Ross Phone #: ###-####
Construction complete. TO given for Zoo Boise gift shops, and is only conditional upon some outdoor lighting fixtures. Grass in distrurbed area that was seeded has established well. ESC permit conditions complete, clear to take down permit sign. No further inspections necessary.
|
ESC15-01133
| DOC - Permit Finaled | 9/15/2015 | 9/15/2015 | 9/15/2015 11:10:16 AM | P | PASS |
|
|
(This activity was added in error so we have changed the case status back to Issued.)
|
ESC14-00212
| General Inspection | 9/15/2015 | 9/15/2015 | 9/15/2015 11:02:13 AM | | PASS |
|
|
DI bag on Lusk was still installed upon inspection. All other ESC conditions previously satisfied. Called RP and he had worker meet me on site and I assisted with DI bag removal. I had him haul it off and throw away.
|
ESC14-00212
| DOC - Permit Finaled | 9/15/2015 | 9/15/2015 | 9/15/2015 11:00:39 AM | P | PASS |
|
|
|
ESC15-01001
| Site Preparation | 9/14/2015 | 9/15/2015 | 9/15/2015 10:43:37 AM | A | PASS |
|
|
Robert Phone #: ###-####
WIP on removing old Rodeway Inn asphalt and to build new parking lot behind where the hotel formerly was. Haul off traffic has been restricted to hard surfaces that are to remain. A water truck will be used to keep the surface rinse off to prevent mud getting on truck tires and tracking out to Curtis.
Stormwater runoff is being directed to a makeshift sediment basin and infiltrating. Sheet flow along access drive goes to vegetated strip via curb cuts. Sediment traps at cuts and can be cleaned post construction.
Approved. Permit sign is posted.
|