Inspections for the day of: Monday, September 16, 1996.
Number of inspections: 13
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBill VanDegrift
TitlePLM-INSPECTOR
Phone #794-9372
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM95-00861 INSP - Final9/13/19969/16/19969/16/1996 12:00:00 AMAPART
09/16/96 330 - BUILDING L provide thermol expantion sizing info temp occ RESCHEDULED FROM FRIDAY PM AS PER JERRY VARNER
PLM95-00864 INSP - Final9/13/19969/16/19969/16/1996 12:00:00 AMAPART
09/16/96 330 - BUILDING M provide thermol expantion size info temp occ RE-SCHEDULED AS PER JERRY VARNER
PLM96-02300 INSP - Final9/13/19969/16/19969/16/1996 12:00:00 AMAPASS
09/16/96 330 -
PLM96-02723 INSP - Plumbing Rough-in9/13/19969/16/19969/16/1996 12:00:00 AMAPASS
09/16/96 330 - REINSPECTION FOR UNITS 107 AND 207 CALL ###-#### FOR ACCESS TO 207 WASHER BOXES
PLM96-02737 INSP - Sewer/Water lines-FINAL9/13/19969/16/19969/16/1996 12:00:00 AMAPASS
09/16/96 330 - TEST AT 10:30AM
PLM96-02738 INSP - Sewer/Water lines-FINAL9/13/19969/16/19969/16/1996 12:00:00 AMAPASS
09/16/96 330 -
PLM96-02740 INSP - Sewer line9/13/19969/16/19969/16/1996 12:00:00 AMAPASS
09/16/96 330 - WILL CALL YOU TO GO OUT THERE PM FRIDAY yes done fri pm
PLM96-02746 INSP - Sewer and Water lines9/16/19969/16/19969/16/1996 12:00:00 AMPPASS
09/16/96 330 -
PLM96-02747 INSP - Sewer line FINAL9/16/19969/16/19969/16/1996 12:00:00 AMPNR
09/16/96 330 - ready at 2:00 ì
PLM96-02749 INSP - Sewer and Water lines9/16/19969/16/19969/16/1996 12:00:00 AMPCANC
09/16/96 330 - PREFER LATE PM
PLM96-02740 INSP - Water lines FINAL9/16/19969/16/19969/16/1996 12:00:00 AMPPASS
09/16/96 330 -
PLM96-02382 INSP - Plumbing Rough-in9/16/19969/16/19969/16/1996 12:00:00 AMPFAIL
09/16/96 330 - BASIC 9 hang 1" piping every 32", water system test faile space is backgraded
PLM96-01170 INSP - Final9/16/19969/16/19969/16/1996 12:00:00 AMPPASS
09/16/96 330 -