ELE98-01915
| INSP - Final | 9/16/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | | |
|
|
SCOTT ###-#### PAGER
|
ELE98-01880
| INSP - Final | 9/15/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | A | PASS |
|
|
09/15/98 403 - DAVE ###-####-ELE OK FOR FN INSP-PROBLEM WAS MEC NOT ELE HEAT EXCHANGER. OK
|
ELE98-02833
| INSP - Electrical Rough-In | 9/15/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | A | PASS |
|
|
TOM ###-####
|
ELE98-03201
| INSP - Final | 9/15/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | A | PASS |
|
|
09/15/98 403 - RYAN HOOD PAGER ###-#### PERM SER INSP ..trans jms.. MANUFACTURED HOME.
|
ELE98-03210
| INSP - Final | 9/16/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | P | PASS |
|
|
09/16/98 403 - DEBBIE ###-#### TEMP/POLE. OK
|
ELE98-03163
| INSP - Electrical Rough-In | 9/16/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | P | PASS |
|
|
09/16/98 403 - wade ###-#### BATHROOM REMODEL. OK ì
|
ELE98-03168
| INSP - Electrical Rough-In | 9/15/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | P | PASS |
|
|
09/15/98 403 - Scheduled by Hello!. [4673225].. do am 1st, jim.. POOL BONDING. OK
|
ELE98-01284
| INSP - Electrical Rough-In | 9/14/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | P | PASS |
|
|
09/16/98 403 - ETHAN KCOZEL ###-#### CALL 1ST FOR CONFERENCE DISCUSSED CODE REQUIREMENTS FOR SERVICE INSTALLATION. OK
|
ELE98-01965
| INSP - Electrical Rough-In | 9/16/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | P | PART |
|
|
09/16/98 403 - jim ###-#### BASEMENT CORIDOOR WALLS ELE R/I. OK
|
ELE98-02833
| INSP - Final | 9/16/1998 | 9/16/1998 | 9/16/1998 12:00:00 AM | P | PASS |
|
|
09/16/98 403 - TOM ###-####-FN INSP FINAL FOR BURN AREA. OK
|