Inspections for the day of: Monday, September 16, 2002.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTony Young
TitleBLD-COM/RES INSPECTOR
Phone #794-9462
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01657 BLD-Foundation9/13/20029/16/20029/16/2002 12:00:00 AMANR
MARK; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD02-02002 BLD-Footing9/16/20029/16/20029/16/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/16/2002 at 07:19:56. Contact: ###-####.
BLD02-02017 BLD-Footing9/16/20029/16/20029/16/2002 12:00:00 AMANR
Scheduled by a contractor via Hello! on 09/16/2002 at 07:21:02. Contact: ###-####.
BLD02-01961 BLD-Footing9/13/20029/16/20029/16/2002 12:00:00 AMAPART
jerrad; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
verbal ok on soil from T. R. 9/16/2002 12:34:45 PM
BLD01-00342 BLD-Final9/13/20029/16/20029/16/2002 12:00:00 AMAFAIL
###-####
need elec. sign off 1st 9/16/2002 10:41:41 AM
BLD02-01935 BLD-Framing/Rough-in9/6/20029/16/20029/16/2002 12:00:00 AMAFAIL
###-#### gene
no inspection,, need trades 9/16/2002 9:50:02 AM
BLD02-01026 BLD-Footing9/13/20029/16/20029/16/2002 12:00:00 AMAPART
donny; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
wip on main floor ftgs, pending soil rpt 9/16/2002 10:28:26 AM
BLD00-02990 BLD-Conference9/16/20029/16/20029/16/2002 12:00:00 AMANR
###-#### NINA PERMIT EXTENSION
MEC02-02486 Pressure Test9/16/20029/16/20029/16/2002 12:00:00 AMPPASS
BLD02-02238 BLD-Final9/13/20029/16/20029/16/2002 12:00:00 AMPPART
###-####
already done, no deck inspection,, appears ok 9/17/2002 2:57:50 PM
BLD02-02027 BLD-Framing/Rough-in9/13/20029/16/20029/16/2002 12:00:00 AMPFAIL
TIM; Phone #: ###-#### Internet Inspection Request from: Darla Downs
c/n posted 9/16/2002 3:56:59 PM
BLD02-02016 BLD-Final9/16/20029/16/20029/16/2002 12:00:00 AMPDONE
roof was covered w/out deck inspection, appears ok, no soffit vents 9/16/2002 4:29:00 PM
BLD02-00965 BLD-Conference9/16/20029/16/20029/16/2002 12:00:00 AMPPART
michelle; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
beam ok to at porch 9/16/2002 3:22:43 PM
BLD02-01935 BLD-Framing/Rough-in9/16/20029/16/20029/16/2002 12:00:00 AMPFAIL
gene ###-####, go next door 1st if not at house,, 13,,,,,,,,,,,,, c/n posted 9/16/2002 3:57:45 PM
BLD02-01726 BLD-Framing/Rough-in9/16/20029/16/20029/16/2002 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-01726 BLD-Energy code compliance9/16/20029/16/20029/16/2002 12:00:00 AMPPASS
Phone #: ###-#### Internet Inspection Request from: Rita DeYoung
BLD02-01657 BLD-Foundation9/16/20029/16/20029/16/2002 12:00:00 AMPPART
MARK ###-####, EARLY PM PLEASE
int. ftgs ok, deep to native soil, and pier ftgs, same 9/16/2002 2:45:12 PM
MEC02-02486 Rough-in9/16/20029/16/20029/16/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/16/2002 at 10:09:47. Contact: ###-####.
BLD01-02005 BLD-Conference9/16/20029/16/20029/16/2002 12:00:00 AMPPASS
OK TO EXTEND PER GEORGE SLANE
MEC02-01652 Final9/13/20029/16/20029/13/2002 12:00:00 AMACANC
Scheduled by a contractor via Hello! on 09/13/2002 at 12:48:12. Contact: ###-####. Disp set to [CANC] by a contractor via Hello! on 09/13/2002 at 16:01:26.