Inspections for the day of: Tuesday, September 16, 2003.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Storey
TitleBLD-COM/RES INSPECTOR
Phone #794-9490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-00960 BLD-Aging Inspection9/16/20039/16/20039/16/2003 12:00:00 AM PASS
wip 9/16/2003 8:46:22 AM
BLD03-01622 BLD-Framing/Rough-in9/15/20039/16/20039/16/2003 12:00:00 AMAPASS
gary; Phone #: ###-#### Internet Inspection Request from: Marc Lileks c/n made ok. 9/16/2003 9:36:15 AM
BLD03-01902 BLD-Footing9/15/20039/16/20039/16/2003 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 9/15/2003 at 12:51:00 PM. Contact: ###-####. rebar ok special insp.report pending. 9/16/2003 8:11:15 AM
BLD03-00914 BLD-Framing/Rough-in9/15/20039/16/20039/16/2003 12:00:00 AMAPASS
terry; Phone #: ###-#### Internet Inspection Request from: Annette Moore
BLD03-01474 BLD-Concrete9/15/20039/16/20039/16/2003 12:00:00 AMAPART
BILL CONCRETE FLOOR COVERING MEZZANINE DECK; Phone #: ###-#### Internet Inspection Request from: Marc Lileks placed with special insp. 9/16/2003 8:09:49 AM
BLD03-02045 BLD-Framing/Rough-in9/15/20039/16/20039/16/2003 12:00:00 AMAFAIL
robin; Phone #: ###-#### Internet Inspection Request from: Darla Downs please call first fire blk. ceilling line next to tub/ exstend b-vent out of blg get mech insp. ok to insulate if mech is ok. 9/16/2003 10:20:45 AM
BLD03-00951 BLD-Final9/16/20039/16/20039/16/2003 12:00:00 AMAPASS
MEC03-01485 Final9/16/20039/16/20039/16/2003 12:00:00 AMAPASS
MEC03-02363 Pressure Test9/16/20039/16/20039/16/2003 12:00:00 AMAPASS
pt ok 9/16/2003 9:36:50 AM
BLD03-02119 BLD-Framing/Rough-in9/15/20039/16/20039/16/2003 12:00:00 AMANR
eric; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD00-03428 BLD-Footing9/16/20039/16/20039/16/2003 12:00:00 AMPPASS
randy; Phone #: ###-#### Internet Inspection Request from: Annette Moore west ft rebar ok 8 inches oc for massanary wall up to not including elavator pit ft. 9/16/2003 2:55:55 PM
MEC03-02529 Rough-in9/16/20039/16/20039/16/2003 12:00:00 AMPNR
BLD03-00585 BLD-Conference9/16/20039/16/20039/16/2003 12:00:00 AMPPASS
DAVID; Phone #: ###-#### Internet Inspection Request from: Marc Lileks
BLD03-02045 BLD-Energy code compliance9/15/20039/16/20039/16/2003 12:00:00 AMPNR
robin; Phone #: ###-#### Internet Inspection Request from: Darla Downs
BLD03-01326 BLD-Framing/Rough-in9/15/20039/16/20039/16/2003 12:00:00 AMPNR
brian; Phone #: ###-#### Internet Inspection Request from: Barbara Moore no insp. job not ready for insp. 9/16/2003 1:37:29 PM
BLD02-02919 BLD-Framing/Rough-in9/15/20039/16/20039/16/2003 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 9/15/2003 at 4:03:09 PM. Contact: ###-####.mlb juatified. 9/16/2003 1:04:32 PM
BLD03-00440 BLD-Energy code compliance9/16/20039/16/20039/16/2003 12:00:00 AMPPASS
###-#### albert