Inspections for the day of: Thursday, September 16, 2004.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR04-00348 FIR-Aging Inspection9/16/20049/16/20049/16/2004 12:00:00 AM NR
contractor is waiting for the ceiling grid to be installed5 9/16/2004 4:26:44 PM
BLD04-01033 FIRE-Final Inspection9/15/20049/16/20049/16/2004 12:00:00 AMAFAIL
relocate the front duct smoke detector and tag the fire extinguishers 9/16/2004 1:13:49 PM
FIR04-00470 INSP-Final Inspection9/15/20049/16/20049/16/2004 12:00:00 AMAPASS
fire sprinklers finaled 9/16/2004 1:15:25 PM
BLD04-01041 FIRE-Final Inspection9/15/20049/16/20049/16/2004 12:00:00 AMAPASS
fire life safety finaled 9/16/2004 9:01:37 AM
BLD03-02350 FIRE-Final Inspection9/15/20049/16/20049/16/2004 12:00:00 AMPPASS
fire life safety finaled 9/16/2004 9:02:06 AM
FIR04-00368 INSP-Sprinkler Rough-in9/16/20049/16/20049/16/2004 12:00:00 AMPFAIL
Sprinkler uprights in many locations do not meet spacing requirements of nfpa 13-8.6.5.2.1.6 or 8.6.5.2.1.7 (Also see exhibit 8.18). Sprinkler uprights bocked in many locations by round duct. See nfpa 13-8.6.5.2.1.3. Provide verification sprinkler piping can be attached to the top of the bottom chord of the trusses. See nfpa 13-9.2.1.3.1. Per plans wood screws are shown to be used on the pipe straps. Lag screws have been used instead. Nfpa 13-9.1.5.3.3 requires all holes to be predrelled. Provide verification this has been done. Fire sprinkle contractor has used nails and screws (construction debris) in the gaps between the pipe strap hanger and the pipe it is supposed to hold. This appears to have been done to get a correct fit instead of tightening down the lag screws. Hangers must be listed. See nfpa 13-9.1.1.4.1. Side sammys have been screwed into the 1 3/4" side of the top chord of the trusses to hang the 2 1/2" main. This does not meet nfpa 13-9.1.5.6.1. This inspection was stopped at this point. No other items except those listed specifically above have been looked at. All of the items found are in a very small portion of the project on the first floor. No other areas inspected. All items listed above are addressed in the review notes but plans are being kept in the job shack. Do not cover piping until re-inspection passes. It also appears resubmittals are required on notes #1, #2 and #5 of the plan review. 9/16/2004 1:35:57 PM
BLD04-01245 FIRE-Conference9/16/20049/16/20049/16/2004 12:00:00 AMPDONE
It is ok for the hospital staff to occupy the new nurses station area 9/16/2004 2:51:39 PM
FIR04-00536 INSP-Sprinkler Rough-in/Hydro9/16/20049/16/20049/16/2004 12:00:00 AMPPART
underground supply piping ok to cover 9/16/2004 3:52:37 PM