FIR05-00518
| INSP-Final Inspection | 9/16/2005 | 9/16/2005 | 9/19/2005 9:36:06 AM | P | FAIL |
|
|
Pendant relocated to the lower soffit but no ceiling tile has been installed in the back room.
|
FIR05-00523
| INSP-Sprinkler Rough-in/Hydro | 9/15/2005 | 9/16/2005 | 9/16/2005 4:11:36 PM | P | PART |
|
|
Hard lid areas as marked on the plans are ok to cover.
|
FIR05-00259
| INSP-Final Inspection | 9/16/2005 | 9/16/2005 | 9/16/2005 4:08:50 PM | P | FAIL |
|
|
There are still obstructions to the upright sprinkler heads above the ceiling in the existing chapel and I need calculations for the attic heads in the existing dormers.
|
BLD05-00312
| FIRE-Final Inspection | 9/15/2005 | 9/16/2005 | 9/16/2005 12:05:04 PM | A | FAIL |
|
|
Remove thumbturn locks from doors, provide lever hardware on all doors per review comments and plans.
|
FIR04-00664
| INSP-Final Inspection | 9/16/2005 | 9/16/2005 | 9/16/2005 11:25:51 AM | P | FAIL |
|
|
Need signage on riser door, need test papers, signs on aux drains, certify backflow preventor, forward flush backflow preventor, provide head wrench.
|
FIR04-00650
| INSP-Alarm Testing | 9/15/2005 | 9/16/2005 | 9/16/2005 11:24:22 AM | A | FAIL |
|
|
Need knox key box, lower and test pull station at staff desk, provide second phone line, multiple a/vs are mounted too low, need to test all devices except facp, nac and hood.
|
FIR05-00184
| INSP-Final Inspection | 9/15/2005 | 9/16/2005 | 9/16/2005 11:18:22 AM | A | PASS |
|
|
Hood suppression system operated correctly
|
FIR05-00072
| INSP-Final Inspection | 9/15/2005 | 9/16/2005 | 9/16/2005 9:42:57 AM | A | FAIL |
|
|
Zones and riser location does not match plans. Resubmit to city. Only items tested are the sprinkler devices which are ok
|
BLD05-01585
| FIRE-Final Inspection | 9/15/2005 | 9/16/2005 | 9/16/2005 8:55:19 AM | A | PASS |
|
|
Fire life safety finaled. Fire extinguishers provided. Structural Inspector to verify that the dead bolt is removed from the east exit door.
|