ELE08-01617
| ELE-Aging Inspection | 9/16/2008 | 9/16/2008 | 9/18/2008 10:12:19 AM | | DONE |
|
|
will be doing work later, suc
|
ELE07-03457
| Electrical Rough-In | 9/16/2008 | 9/16/2008 | 9/16/2008 4:00:23 PM | P | PASS |
|
|
Joe Phone #: ###-#### u/g ok to cover north side ilf, and between alf and ilf
|
ESC08-00679
| General Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 3:21:33 PM | P | PART |
|
|
looked ok
|
ESC07-01052
| General Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 3:20:33 PM | P | PART |
|
|
looked ok
|
ESC07-01432
| General Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 3:19:34 PM | P | PART |
|
|
looked ok
|
ESC08-00464
| General Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 3:18:33 PM | A | PART |
|
|
looked ok
|
ESC07-01189
| General Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 3:17:38 PM | A | PART |
|
|
looked ok
|
ESC08-00155
| General Inspection | 9/16/2008 | 9/16/2008 | 9/16/2008 3:16:24 PM | A | PART |
|
|
loked ok
|
ELE08-02423
| Electrical Rough-In | 9/16/2008 | 9/16/2008 | 9/16/2008 3:15:25 PM | P | CANC |
|
|
JASON L1 BLDG 2 UNITS D EAST, D WEST, B1, D1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy see conference
|
ELE08-02423
| Conference | 9/16/2008 | 9/16/2008 | 9/16/2008 3:15:07 PM | P | DONE |
|
|
JASON L1 BLDG 2 UNITS D EAST, D WEST, B1, D1 Phone #: ###-#### Internet Inspection Request from: Sean DeLacy met electricians, talked about and reviewed 1 unit, told that receptacle spacing shall be met, reviewed 1 1/4", looked at service areas, told to show listing for assemblies for meters, reviewed plans, reviewed requirement to follow 2008 NEC, will need separate permits for each meter
|
ELE08-02531
| Electrical Rough-In | 9/16/2008 | 9/16/2008 | 9/16/2008 12:46:45 PM | P | PART |
|
|
Inspection for undeground work associated with St Als Parking Lot Modifications. Project located at end of Hartman just inside of Stal''s Parking Lot. Loren Ramsey is field electrician Cell ####-#### Phone #: ###-#### Internet Inspection Request from: Kevin Perez ok to cover west side mov-6 parking lot u/g for north south run only- 1 conduit
|
ELE08-02493
| Electrical Rough-In | 9/15/2008 | 9/16/2008 | 9/16/2008 10:03:11 AM | A | PASS |
|
|
Need an exterior soffit inspection please.Thanks Phone #: ###-#### Internet Inspection Request from: ERIC CENTERS exterior soffits only ok to cover
|
ELE08-00246
| Final | 9/15/2008 | 9/16/2008 | 9/16/2008 9:41:20 AM | A | PASS |
|
|
jerod Phone #: ###-#### corrections made, ok to final
|
ELE07-04164
| Final | 9/15/2008 | 9/16/2008 | 9/16/2008 9:10:42 AM | A | PASS |
|
|
#7121282.Replaced the existing burned-up circuit breaker panel in the garage with a new one & installed 2 new ground rods on December 18,2007 and failed to schedule the inspection. Thanks, Dan. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to final, no esc this project
|
ELE07-04164
| Permanent Service | 9/16/2008 | 9/16/2008 | 9/16/2008 9:03:15 AM | A | PASS |
|
|
#7121282.Replaced the existing burned-up circuit breaker panel in the garage with a new one & installed 2 new ground rods on December 18,2007 and failed to schedule the inspection. Thanks, Dan. Phone #: ###-#### Internet Inspection Request from: Dan Mitchell called contractor, p/s u/g rec ok, no esc this project
|
ELE08-02394
| Electrical Rough-In | 9/15/2008 | 9/16/2008 | 9/16/2008 8:54:28 AM | A | PASS |
|
|
Uffer inspection on north side Phone #: ###-#### Internet Inspection Request from: Mark Sessions ok to pour concrete encased electrode
|
ELE08-02433
| Final | 9/15/2008 | 9/16/2008 | 9/16/2008 8:18:17 AM | A | PASS |
|
|
Brian Phone #: ###-#### ok to final, signed occupancy card, no esc this project
|