Inspections for the day of: Tuesday, September 16, 2008.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00518 INSP-Final Inspection9/16/20089/16/20089/19/2008 3:58:45 PMPPASS
Permit finaled
FIR08-00402 INSP-Sprinkler Rough-in9/16/20089/16/20089/17/2008 2:34:13 PMPPART
The bucket test passed. The two head area flowed 31 gallons and the single head area flowed 22 gallons. I gave the ok to cover the piping with the condition that as-built plans and hydraulic calculations are re-submitted to the city. This is due to the interconnecting piping to and between the four manifolds, as installed, does not match the city approved plans.
FIR08-00322 INSP-Final Inspection9/16/20089/16/20089/17/2008 11:14:45 AMPPASS
permit finaled
FIR08-00638 INSP-Conference9/16/20089/16/20089/16/2008 3:27:01 PMPDONE
Mark Senteno and I agreed that the manual activation for the hood suppression can be placed on the left hand side of the east exterior exit door.
FIR08-00627 INSP-Sprinkler Rough-in/Hydro9/16/20089/16/20089/16/2008 3:25:40 PMPPASS
Todays inspection was for just the 12'-0" of 6" stub-out. This underground piping is ok to bury.
BLD08-01786 FIRE-Final Inspection9/16/20089/16/20089/16/2008 2:46:28 PMPFAIL
The project was not ready for a final inspection yet but we verified that the smoke evacuation system operated correctly.
BLD08-00622 FIRE-Conference9/16/20089/16/20089/16/2008 2:45:15 PMPCANC
The conference was not required on site and was taken care of over the phone.
FIR05-00596 INSP-Final Inspection9/16/20089/16/20089/16/2008 11:27:11 AMAPASS
Permit finaled
FIR05-00836 INSP-Final Inspection9/16/20089/16/20089/16/2008 11:00:42 AMAPASS
Permit finaled