FIR09-00390
| INSP-Sprinkler Rough-in/Hydro | 9/15/2009 | 9/16/2009 | 9/17/2009 7:03:17 AM | A | PART |
|
|
TOC approved.
|
FIR09-00386
| INSP-Sprinkler Rough-in/Hydro | 9/15/2009 | 9/16/2009 | 9/17/2009 7:02:57 AM | A | PART |
|
|
TOC approved.
|
FIR09-00290
| INSP-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 7:02:38 AM | A | PART |
|
|
TOC approved.
|
FIR09-00176
| INSP-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 7:02:19 AM | A | PART |
|
|
TOC approved.
|
BLD08-01555
| FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 7:02:01 AM | A | PART |
|
|
TOC approved.
|
BLD08-01555
| FIRE-Alarm Testing | 9/15/2009 | 9/16/2009 | 9/17/2009 7:01:42 AM | A | PART |
|
|
TOC approved.
|
BLD09-00172
| FIRE-Alarm Testing | 9/15/2009 | 9/16/2009 | 9/17/2009 7:01:24 AM | A | PART |
|
|
TOC approved.
|
BLD09-00172
| FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 7:01:04 AM | A | PART |
|
|
TOC approved.
|
BLD09-00171
| FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 7:00:45 AM | A | PART |
|
|
TOC approved.
|
BLD09-00171
| FIRE-Alarm Testing | 9/15/2009 | 9/16/2009 | 9/17/2009 7:00:26 AM | A | PART |
|
|
TOC approved.
|
BLD09-00170
| FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 7:00:06 AM | A | PART |
|
|
TOC approved.
|
BLD09-00170
| FIRE-Alarm Testing | 9/15/2009 | 9/16/2009 | 9/17/2009 6:59:45 AM | A | PART |
|
|
TOC approved.
|
BLD09-00169
| FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 6:59:24 AM | A | PART |
|
|
TOC approved.
|
BLD09-00169
| FIRE-Alarm Testing | 9/15/2009 | 9/16/2009 | 9/17/2009 6:59:03 AM | A | PART |
|
|
TOC approved.
|
BLD09-00168
| FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 6:58:42 AM | A | PART |
|
|
TOC approved.
|
BLD09-00168
| FIRE-Alarm Testing | 9/15/2009 | 9/16/2009 | 9/17/2009 6:58:20 AM | A | PART |
|
|
TOC approved.
|
FIR09-00261
| INSP-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 6:57:56 AM | A | PART |
|
|
TOC approved.
|
FIR09-00260
| INSP-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 6:57:33 AM | A | PART |
|
|
TOC approved.
|
FIR09-00363
| INSP-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 6:57:09 AM | A | PART |
|
|
TOC approved.
|
FIR09-00033
| INSP-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 6:56:39 AM | A | PART |
|
|
TOC approved
|
FIR09-00376
| FIR-Aging Inspection | 9/16/2009 | 9/16/2009 | 9/17/2009 6:51:06 AM | | DONE |
|
|
Work in progress, construction underway.
|
BLD07-02143
| FIRE-Final Inspection | 9/16/2009 | 9/16/2009 | 9/17/2009 6:49:46 AM | P | FAIL |
|
|
Smoke alarms at unit 101 are not interconnected per IFC and NFPA 72 requirements.
|
FIR09-00212
| INSP-Final Inspection | 9/14/2009 | 9/16/2009 | 9/17/2009 6:48:02 AM | P | PASS |
|
|
Fire alarm testing passed, permit finaled.
|
FIR09-00211
| INSP-Final Inspection | 9/14/2009 | 9/16/2009 | 9/17/2009 6:47:22 AM | P | PASS |
|
|
Fire alarm testing passed, permit finaled.
|
FIR09-00478
| INSP-Final Inspection | 9/16/2009 | 9/16/2009 | 9/17/2009 6:46:32 AM | P | PASS |
|
|
Fire sprinkler permit work approved for final status, inspection passed.
|
BLD07-02147
| FIRE-Final Inspection | 9/16/2009 | 9/16/2009 | 9/17/2009 6:45:17 AM | P | PASS |
|
|
Fire life safety inspection completed acceptable.
|
FIR08-00830
| INSP-Sprinkler Rough-in/Hydro | 9/16/2009 | 9/16/2009 | 9/17/2009 6:44:29 AM | P | PART |
|
|
For hydrostatic testing at the 1st floor wet system.
|
FIR09-00546
| INSP-Sprinkler Rough-in | 9/15/2009 | 9/16/2009 | 9/17/2009 6:42:51 AM | P | PART |
|
|
Overhead work at the 11th floor is good for cover, 8th floor work is incomplete at this time.
|
FIR09-00496
| INSP-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 6:41:17 AM | A | PASS |
|
|
Fire alarm work per the scope of permit tested satisfactory, okay for final.
|
BLD09-01204
| FIRE-Final Inspection | 9/15/2009 | 9/16/2009 | 9/17/2009 6:39:58 AM | A | FAIL |
|
|
EM lights at both the second and third floor lobbies failed to function upon power loss.
|
FIR08-00830
| INSP-Sprinkler Rough-in/Hydro | 9/15/2009 | 9/16/2009 | 9/17/2009 6:38:30 AM | A | PART |
|
|
Overhead hydrostatic test of the 6" feed main to the second floor manifolds passed.
|
BLD09-01405
| FIRE-Final Inspection | 9/16/2009 | 9/16/2009 | 9/16/2009 12:00:00 AM | A | NR |
|
|
Space not ready for final inspection. Inspection correction items include the need for at least one fire extinguisher, and replacement of sticker on main exterior door signage indicating "Doors to be unlocked when building is occupied". Existing sticker is deteriorated.
|
FIR09-00512
| INSP-Final Inspection | 9/16/2009 | 9/16/2009 | 9/16/2009 12:00:00 AM | P | PASS |
|
|
Fire alarm final inspection is satisfactory.
|
FIR09-00485
| INSP-Final Inspection | 9/16/2009 | 9/16/2009 | 9/16/2009 12:00:00 AM | P | PASS |
|
|
Fire sprinkler final inspection is satisfactory.
|
BLD09-01082
| FIRE-Final Inspection | 9/16/2009 | 9/16/2009 | 9/16/2009 12:00:00 AM | P | PASS |
|
|
Fire & Life Safety inspection is satisfactory.
|