BLD10-00245
| BLD-Aging Inspection | 9/16/2010 | 9/16/2010 | 9/23/2010 2:14:40 PM | | FAIL |
|
|
R105.5 Expiration. Every permit issued shall become invalid unless the work authorized by such permit is commenced within 180 days after its issuance, or if the work authorized by such permit is suspended or abandoned for a period of 180 days after the time the work is commenced. The building official is authorized to grant, in writing, one or more extensions of time, for periods not more than 180 days each. The extension shall be requested in writing and justifiable cause demonstrated.
R105.8 Responsibility. It shall be the duty of every person who performs work for the installation or repair of building, structure, electrical, gas, mechanical or plumbing systems, for which this code is applicable, to comply with this code.
|
BLD09-00941
| BLD-Aging Inspection | 9/16/2010 | 9/16/2010 | 9/23/2010 9:15:08 AM | | DONE |
|
|
|
BLD10-00623
| BLD-Aging Inspection | 9/16/2010 | 9/16/2010 | 9/17/2010 1:19:32 PM | | PASS |
|
|
phased work
|
BLD10-01466
| BLD-Final | 9/16/2010 | 9/16/2010 | 9/16/2010 3:36:43 PM | P | DEFR |
|
|
|
BLD10-02155
| BLD-Final | 9/16/2010 | 9/16/2010 | 9/16/2010 3:02:59 PM | P | PASS |
|
|
Todd Phone #: ###-####
|
BLD10-02155
| DOC - Permit Finaled | 9/16/2010 | 9/16/2010 | 9/16/2010 3:02:07 PM | P | PASS |
|
|
|
BLD09-02238
| BLD-Final | 9/15/2010 | 9/16/2010 | 9/16/2010 2:39:24 PM | P | NR |
|
|
Cole Seely ###-#### fire c/n
|
BLD10-00636
| BLD-Final | 9/16/2010 | 9/16/2010 | 9/16/2010 2:23:22 PM | P | PART |
|
|
Jim, I''ll give you a call. Kent Mortensen I''mm filling in for Dave while he''s having surgery. Phone #: ###-#### >> Inspection requested via web by David Mortensenfinal ok pending mech sign off.
|
ESC10-00471
| Site Final | 9/16/2010 | 9/16/2010 | 9/16/2010 2:22:21 PM | P | PASS |
|
|
|
BLD10-00229
| BLD-Aging Inspection | 9/16/2010 | 9/16/2010 | 9/16/2010 11:49:44 AM | | PART |
|
|
conf with tenent to get permit completed.
|
BLD10-00229
| BLD-Conference | 9/16/2010 | 9/16/2010 | 9/16/2010 11:19:57 AM | A | PART |
|
|
Informed tenent to go down to the city and get copy of all documantation and call for fire insp.
|
BLD10-01466
| BLD-Final | 9/14/2010 | 9/16/2010 | 9/16/2010 10:19:07 AM | A | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Todd Blackwell 1.R311.5.6.2 Continuity. Handrails for stairways shall be continuous for the full length of the flight, from a point directly above the top riser of the flight to a point directly above the lowest riser of the flight. Handrail ends shall be returned or shall terminate in newel posts or safety terminals. Handrails adjacent to a wall shall have a space of not less than 1½ inch (38 mm) between the wall and the handrails. Exceptions: 1. Handrails shall be permitted to be interrupted by a newel post at the turn. 2. The use of a volute, turnout, starting easing or starting newel shall be allowed over the lowest tread. 2. 2. The exterior landing at an exterior doorway shall not be more than 7¾ inches (196 mm) below the top of the threshold, provided the door, other than an exterior storm or screen door does not swing over the landing.3. R309.1.2 Other penetrations. Penetrations through the separation required in Section R309.2 shall be protected by filling the opening around the penetrating item with approved material to resist the free passage of flame and products of combustion. ele and gas lines.
|