PDS Online
Making
Boise
the most livable city in the country.
Home
Permits
Search by Permit Number
How to search by permit number
Search by Address
Search by Customer Number
Search by Current Planning Number
Search in Project by Permit Number
Search by Project Name
Inspections
Search by Permit Number
Search by Request Date
Search by Company Name
Fees
Impact Fees Estimate Calculator
Other Searches
Search for Licensed Contractors
Search Parcel by Address
Search Historical Surveys
Reports
Daily Reports
Weekly Reports
Monthly Reports
Home
/
Inspections
/
Inspector Activity
Inspections for the day of:
Thursday, September 16, 2010
.
Number of inspections:
8
Percentage of inspections complete:
100 %
Percentage of inspections not complete:
0 %
Contact Information
Inspector
Clint A Smith
Title
EROSION CONTROL INSPECTOR
Phone #
794-8996
Permit Number
Description
Received
Requested
Completed
AM/PM
Disposition
ESC10-00691
Site Preparation
9/16/2010
9/16/2010
9/17/2010 9:52:56 AM
NR
ESC10-00667
Conference
9/16/2010
9/16/2010
9/16/2010 4:15:18 PM
P
DONE
Went over the ESC plan with the RP and discussed over perimeter control that will be required. Also informed him that he does fall under the federal requirements to file an NOI due to being part of a larger commen plan of developement and sale.
ESC10-00283
Site Preparation
9/2/2010
9/16/2010
9/16/2010 3:43:31 PM
A
PASS
ESC08-00043
Aging Inspection
9/16/2010
9/16/2010
9/16/2010 2:46:40 PM
CANC
ESC10-00686
Site Preparation
9/16/2010
9/16/2010
9/16/2010 2:41:18 PM
PASS
ESC10-00472
BMP Violation
9/15/2010
9/16/2010
9/16/2010 1:43:16 PM
A
FAIL
Message to RP:
CORRECTION NOTICE.
1. Install sediment barrier along the slopes on the perimeter. (Proctect drainage channel & slopes at the front of lot.)
2. Maintain concrete washout due to being over 50% capacity.
** Failure to comply will result in a Stop Work Order. Will re-inspect on 09/17/2010 3:30pm.
ESC10-00684
Site Preparation
9/15/2010
9/16/2010
9/16/2010 10:49:57 AM
A
PASS
10:30am
ESC10-00687
Site Preparation
9/16/2010
9/16/2010
9/16/2010 8:51:06 AM
PART
Verbal to RP:
Prior to a storm event, cover the stock pile with visquen or remove sockpile located in the drive way.