Inspections for the day of: Thursday, September 16, 2010.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC10-00691 Site Preparation9/16/20109/16/20109/17/2010 9:52:56 AM NR
ESC10-00667 Conference9/16/20109/16/20109/16/2010 4:15:18 PMPDONE
Went over the ESC plan with the RP and discussed over perimeter control that will be required. Also informed him that he does fall under the federal requirements to file an NOI due to being part of a larger commen plan of developement and sale.
ESC10-00283 Site Preparation9/2/20109/16/20109/16/2010 3:43:31 PMAPASS
ESC08-00043 Aging Inspection9/16/20109/16/20109/16/2010 2:46:40 PM CANC
ESC10-00686 Site Preparation9/16/20109/16/20109/16/2010 2:41:18 PM PASS
ESC10-00472 BMP Violation9/15/20109/16/20109/16/2010 1:43:16 PMAFAIL
Message to RP:
CORRECTION NOTICE.
1. Install sediment barrier along the slopes on the perimeter. (Proctect drainage channel & slopes at the front of lot.)
2. Maintain concrete washout due to being over 50% capacity.
** Failure to comply will result in a Stop Work Order. Will re-inspect on 09/17/2010 3:30pm.
ESC10-00684 Site Preparation9/15/20109/16/20109/16/2010 10:49:57 AMAPASS
10:30am
ESC10-00687 Site Preparation9/16/20109/16/20109/16/2010 8:51:06 AM PART
Verbal to RP:
Prior to a storm event, cover the stock pile with visquen or remove sockpile located in the drive way.