BLD10-01664
| FIRE-Final Inspection | 9/16/2011 | 9/16/2011 | 9/16/2011 4:52:06 PM | P | PASS |
|
|
Previously noted correction items verified for completion. Fire life safety finaled.
|
BLD11-02144
| FIRE-Final Inspection | 9/16/2011 | 9/16/2011 | 9/16/2011 4:50:53 PM | P | FAIL |
|
|
Remove conflicting address numbers, provide approved hardware at the secondary exit door (keyed hardware allowed at only one location).
|
FIR11-00413
| INSP-Final Inspection | 9/16/2011 | 9/16/2011 | 9/16/2011 4:48:24 PM | P | PART |
|
|
Relocated heads at marked locations with today's date on approved plans okay for cover.
|
FIR11-00221
| INSP-Final Inspection | 9/16/2011 | 9/16/2011 | 9/16/2011 4:46:37 PM | P | PASS |
|
|
Correction items completed. Final walkthrough passed, permit finaled.
|
FIR11-00355
| INSP-Sprinkler Rough-in | 9/16/2011 | 9/16/2011 | 9/16/2011 4:45:34 PM | P | FAIL |
|
|
Inspection for cover at the three 2nd floor classrooms and both the 1st floor restrooms failed due to obstructed heads, one missing head, missing seismic bracing, sprig in need of adjustment, access, etc.
|
BLD11-02237
| FIRE-Final Inspection | 9/15/2011 | 9/16/2011 | 9/16/2011 11:05:46 AM | A | PASS |
|
|
Fire life safety inspection completed satisfactory.
|