BLD14-01378
| BLD-Conference | 9/15/2014 | 9/16/2014 | 9/17/2014 12:11:39 PM | A | FAIL |
|
|
Phone #: ###-#### Inspection requested via web by Scott Smith Must be wrong address......no new roof @ 9810. Called contr. No return call.
|
BLD14-02190
| BLD-Footing | 9/16/2014 | 9/16/2014 | 9/17/2014 12:09:59 PM | P | PEND |
|
|
Lance Phone #: ###-#### Called lance on 9/16 and 9/17 no return call. No appr plans on site.
|
BLD14-02009
| BLD-Final | 9/16/2014 | 9/16/2014 | 9/17/2014 12:08:38 PM | P | PEND |
|
|
David Phone #: ###-#### Called David....no return call Need appr plan to verify smoke/det Co2 ??????
|
MIS14-00222
| BLD-Conference | 9/15/2014 | 9/16/2014 | 9/16/2014 5:01:48 PM | A | DONE |
|
|
constructing a water feature in back yard that is over 6 ft tall Walked into back yard........ top of rock feature is approx. 5' 10" and more than 5' away from rear property line. OK with Bldg. code. Called Zoning...........Zoning OK with situation.
|
MIS14-00222
| DOC - Permit Finaled | 9/16/2014 | 9/16/2014 | 9/16/2014 4:55:52 PM | P | PASS |
|
|
|
BLD14-02141
| BLD-Framing/Rough-in | 9/16/2014 | 9/16/2014 | 9/16/2014 4:40:14 PM | P | PART |
|
|
Andy Phone #: ###-#### C/N posted OK to insulate
|
GCB12-00156
| GCB-Final | 9/16/2014 | 9/16/2014 | 9/16/2014 4:39:19 PM | P | PEND |
|
|
Julio ###-#### Walk thru
|
BLD14-01774
| BLD-Energy code compliance | 9/16/2014 | 9/16/2014 | 9/16/2014 1:29:18 PM | P | PASS |
|
|
Greg Phone #: ###-####
|
MIS14-00215
| BLD-Conference | 9/9/2014 | 9/16/2014 | 9/16/2014 1:28:55 PM | A | DONE |
|
|
Owner going to tear down.......3/4 complete.
|
GCB14-00009
| GCB-Shearwall | 9/15/2014 | 9/16/2014 | 9/16/2014 12:20:08 PM | A | PART |
|
|
Dylan ###-#### All Exterior shear nailing.......OK
|
GCB14-00109
| GCB-Footing | 9/15/2014 | 9/16/2014 | 9/16/2014 12:12:05 PM | A | PASS |
|
|
Ryan ###-####
|