ESC13-00975
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 3:30:36 PM | | PASS |
|
|
|
ESC14-00583
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 3:23:53 PM | P | FAIL |
|
|
See ESC13-00970
|
ESC14-00556
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 3:23:12 PM | P | FAIL |
|
|
See ESC13-00970
|
ESC14-00160
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 3:22:48 PM | P | FAIL |
|
|
See ESC13-00970
|
ESC14-00163
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 3:22:21 PM | P | FAIL |
|
|
See ESC13-00970
|
ESC13-00970
| Aging Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 3:16:28 PM | | FAIL |
|
|
Observations at Tianna Park:
1. No removal of drop inlet bag in first sectionas requested multiple times. Now full of leaves and sediment. Needs removal.
2. Trash, debris, and sediment deposited in poorly protected drainage swale.
3. Sediment from both active Sunrise homes is uncontained and all over access road.
4. Very little attention or consideration to keeping a clean site.
Actions:
Fail inspections for both active sites. Will reinspect Friday morning. If no changes will issue second Correction Notice to Sunrise and begin to proceed with Stop Work Orders.
See ESC14-00163, 00160, 00556, 00583 for Sunrise Homes in Tianna Park that are in similiar condition as mentioned in this inspection.
|
ESC14-00424
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 12:22:31 PM | | PASS |
|
|
Smoking shelter structure at Albertson's HQ is complete and surrounding area and asphalt stabilized. No further ESC inspections required.
|
ESC14-00424
| DOC - Permit Finaled | 9/16/2014 | 9/16/2014 | 9/16/2014 12:21:39 PM | P | PASS |
|
|
|
ESC14-00094
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 12:18:49 PM | | PASS |
|
|
Cancer memorial is in progress. Area of disturbance has heavy duty fiber wattle between it and the goose pond. The other edges of site have inward sloping sheet flow with no flow towards river. The pier structure on bank of pond has not yet started.
Permit is posted, site is surrounded by orange fencing, and no trackout observed to Myrtle.
|
ESC14-00215
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 9:47:00 AM | | PART |
|
|
Rock placing and landscaping around home is in progress so there is some sediment/dirt in the street sidewalk. Advised employee to sweep and clean at end of day.
Contractor appears to be using excavator as RP who is not in control of site....Will check back.
|
ESC13-01181
| Aging Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 9:39:35 AM | | PASS |
|
|
WIP. No exterior disturbance or sediment leaving site.
|
ESC13-00892
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 9:20:17 AM | | PASS |
|
|
Aviation Specialties is going through finishing touches on parking lot and interior work. Grounds have been landscaped and the parking lot paved. No corrections necessary.
|
ESC14-00240
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 9:19:01 AM | | PASS |
|
|
Airport paving project is in progress. NOI filed. Work and sediment contained within the restricted area. Stormwater structure are said to be protected and all discharge goes to numerous retention/infiltration ponds.
|
ESC14-00031
| General Inspection | 9/16/2014 | 9/16/2014 | 9/16/2014 8:34:41 AM | | PASS |
|
|
Parks and Rec in compliance with permit conditions and contractors working on projects must pull their own permit. No issues or complaints received or observed lately.
|