ELE15-01348
| Electrical Rough-In | 9/16/2016 | 9/16/2016 | 9/16/2016 2:52:21 PM | P | PASS |
|
|
overhead Level 1 stack 2 partial. Call Frank. Requesting after 2 pm show up. Phone #: ###-#### Inspection requested via web by Brandon Robinson
hard lid as noted on print ok to cover
|
ELE16-00089
| Electrical Rough-In | 9/15/2016 | 9/16/2016 | 9/16/2016 2:30:00 PM | P | PASS |
|
|
. Call Rafael for inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo
2nd floor area grid as noted on print
|
ELE16-00089
| Final | 9/16/2016 | 9/16/2016 | 9/16/2016 2:27:45 PM | P | PART |
|
|
TCO inspection for 4th and 5th floor of GBAD buidling TI portion. Call Rafael for inspection. Phone #: ###-#### Inspection requested via web by Rafael Castillo
4th floor only ok to occupy...5th floor fail for 2 outlets and bonding of cable tray
|
ELE15-00495
| Final | 9/16/2016 | 9/16/2016 | 9/16/2016 2:24:31 PM | P | FAIL |
|
|
Walk 5 story for TCO. Contact is Toby Groves ###-#### Phone #: ###-#### Inspection requested via web by Toby Groves
exit signs need installed x 2
|
ELE16-00198
| Electrical Rough-In | 9/15/2016 | 9/16/2016 | 9/16/2016 12:44:11 PM | P | FAIL |
|
|
Juanita Phone #: ###-####
334.30 romex shall be supported within 12" of box
300.4(b) conductor larger than #4 shall have bushing
all openings shall be closed-sub panel
conference needed
|
ELE16-03007
| Rough-In Permanent Service | 9/16/2016 | 9/16/2016 | 9/16/2016 12:27:53 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by daniel bibikov
roughin ok to cover p/s u/g n ok 5 meters
|
ELE16-00506
| Final | 9/15/2016 | 9/16/2016 | 9/16/2016 11:25:24 AM | A | CANC |
|
|
closing off the electrical waiting for inspections to be moved to proper permit
|
ELE16-01750
| Final | 9/13/2016 | 9/16/2016 | 9/16/2016 10:03:04 AM | A | FAIL |
|
|
Robert. Temp occupancy. Phone #: ###-#### Inspection requested via web by Sean DeLacy
not ready...missing plates, lights, gfi protection...whips for heaters and equipment not installed...gfi breakers need installed for employee areas
|
ELE15-01348
| Electrical Rough-In | 9/15/2016 | 9/16/2016 | 9/16/2016 9:34:31 AM | A | PASS |
|
|
Quad Core Elev. Pits ; top of hoistway east side Ground Level stack 1
Conference on Article 400.7 and 400.8 IDF Rack PWR Walk thru Basement Discuss TCO prior to meeting 9/21 Thanks Phone #: ###-#### Inspection requested via web by Tom Betty
rough elevator pit and hoist area-light and outlet ok....conference wiring of low volt room using s/o cable for wiring method....tco conference did not do-wait for Rock/Daryl
|
ELE16-03006
| Temporary Service | 9/15/2016 | 9/16/2016 | 9/16/2016 8:22:29 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
t/s u/g n ok
|