Inspections for the day of: Monday, September 16, 2019.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTom Saunders
TitleELE-INSPECTOR
Phone #208-794-1923
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE19-03194 Permanent Service9/16/20199/16/20199/16/2019 2:30:48 PMPPASS
Permanent 400A 480V 3 phase service Phone #: ###-#### Inspection requested via web by kyle carson...
p/s u/g new ok
ELE16-02003 ELE-Aging Inspection9/16/20199/16/20199/16/2019 1:58:39 PM NH
no answer at door..tag left
ELE16-01661 ELE-Aging Inspection9/16/20199/16/20199/16/2019 1:34:42 PM PASS
main contact with person at residence...permit holder unable to come to door do to not feeling well...informed person of open permit that needed to be addressed and asked to let permit holder know
ELE19-03482 Permanent Service9/16/20199/16/20199/16/2019 1:19:44 PMPPASS
Please contact Jake if needed Phone #: ###-#### Inspection requested via web by Deb Ipsen...
new meter/main and riser
no access to apply sticker
p/s o/h reconnect ok
ELE19-03472 Rough-In Permanent Service9/16/20199/16/20199/16/2019 12:23:23 PMPPASS
Phone #: ###-#### Inspection requested via web by Tyler Ridley....
installing in panel board (same size) and up grading grounding
rough in of garage outlets, new 4 wire to range, and FGCI protection where needed
p/s o/h reconnect ok
ELE19-03319 Electrical Rough-In9/13/20199/16/20199/16/2019 10:00:42 AMAPASS
Contact is Brian Prussia. Thanks! Phone #: ###-#### Inspection requested via web by BRS Permitting....
UL listing verified
discussed clearances and placement for disconnects
will need access to main panel at final
ELE19-01916 Electrical Rough-In9/13/20199/16/20199/16/2019 9:21:34 AMAPASS
Rough-In for additional work (basement) added to permit. Inspection requested via web by Lauren Houck....ok to cover walls and ceiling dwn stairs bedroom...outlets added/moved for wall spacing...junction boxes need made accessible check at final celing or wall
ELE19-03443 Electrical Rough-In9/15/20199/16/20199/16/2019 8:58:39 AMAPASS
underground conduit inspection Phone #: ###-#### Inspection requested via web by Christy Cheney....
underground for new parking lot lights...ok to cover
ELE19-03419 Final9/15/20199/16/20199/16/2019 8:34:27 AMACANC
100 amp service change. Install meter/main panel. Upgrade grounding/bonding. Key to back door is on top of outdoor panel. Phone #: ###-#### Inspection requested via web by Douglas Hackney...
need meter installed before permit can be finaled..inspection changed to permanent service inspection...rescheduled FINAL required once power restored
ELE19-03419 Permanent Service9/16/20199/16/20199/16/2019 8:31:25 AMAPASS
100 amp service change. Install meter/main panel. Upgrade grounding/bonding. Key to back door is on top of outdoor panel. Phone #: ###-#### Inspection requested via web by Douglas Hackney....p/s o/h reconnect ok
ELE19-03476 Electrical Rough-In9/15/20199/16/20199/16/2019 8:10:13 AMAPASS
Best access is at back of building Phone #: ###-#### Inspection requested via web by Brad Girard...
3 new offices walls ok to cover...new switches and outlet in each
ELE16-01924 ELE-Aging Inspection9/16/20199/16/20199/16/2019 7:46:33 AM PASS
still under construction