MEC96-01940
| INSP - Rough-in & Gas Pressure | 9/16/1996 | 9/17/1996 | 9/19/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - ANDIE WILL CALL YOU AND SEE IF YOU CAN DO IT 9-16 PM GP -OK GAS PIPING RGHN-OK ROUGH IN
|
MEC96-02679
| INSP - Retro Fit (check note) | 9/16/1996 | 9/17/1996 | 9/19/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - CALL OFFICE AT BOISE HEATING ###-#### FOR ACCESS LATE PM FNL -OK FINAL GAS BY GAS CO
|
MEC96-02681
| INSP - Rough-in & Gas Pressure | 9/16/1996 | 9/17/1996 | 9/19/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - GP -OK GAS PIPING RGHN-OK ROUGH IN
|
MEC96-02682
| INSP - Rough-in & Gas Pressure | 9/16/1996 | 9/17/1996 | 9/19/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - GP -OK GAS PIPING RGHN-OK ROUGH IN
|
MEC96-02619
| INSP - Retro Fit (check note) | 9/17/1996 | 9/17/1996 | 9/19/1996 12:00:00 AM | P | PASS |
|
|
09/18/96 337 - ELECTRIC TO GAS FURNACE AND ELECTRIC TO GAS WATER HEATER FNL -OK FINAL GAS BY GAS CO
|
MEC96-02689
| INSP - Retro Fit (check note) | 9/17/1996 | 9/17/1996 | 9/19/1996 12:00:00 AM | P | PASS |
|
|
09/18/96 337 - PLEASE CALL KEVIN W/HOLLINGSWORTH HE HAS A KEY TO THE HOU ###-#### FURNACE 2 W/H AND A PRESSURE TEST FNL -OK FINAL GAS TEST BY GAS CO
|
MEC96-01979
| INSP - Gas log/ Fireplace | 9/16/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | FAIL |
|
|
09/18/96 337 - KEY IN THE AM DOWN SPOUT RAIN GUTTER FRONT DOOR CORR-CORREC-CALL FOR REINSP WHEN COMPLETED
|
MEC96-00585
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - YOU NEED TO SIGN THE OCC PERM CARD AS PER XENON FNL -OK FINAL
|
MEC96-00585
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - YOU NEED TO SIGN THE OCC PERM CARD AS PER XENON FNL -OK FINAL
|
MEC96-00587
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - CONTACT XENON ###-#### 99109 X GARDIAN AREA FAB 4 PHASE I FNL -OK FINAL
|
MEC96-00587
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - CONTACT XENON ###-#### 99109 X GARDIAN AREA FAB 4 PHASE I FNL -OK FINAL
|
MEC96-01421
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - CONTACT: JERRY HINE ###-#### BLDG 24 FAB 4 PHASE II FNL -OK FINAL
|
MEC96-01421
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - CONTACT: JERRY HINE ###-#### BLDG 24 FAB 4 PHASE II FNL -OK FINAL
|
MEC96-01939
| INSP - Gas pressure test | 9/16/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - ANDIE WILL CALL YOU AND SEE IF YOU CAN DO IT 9-16 PM GP -OK GAS PIPING RGHN-OK ROUGH IN
|
MEC96-02584
| INSP - Conference | 9/13/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - PREFERS 9AM -- CALL PAUL FROM SUNSHINE AT ###-#### TO SCH PHONE CONFERENCE
|
MEC96-02628
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - BUILDING 24/CMP BAYS - $6,041.00-PROVIDE TEFLON LINED STA DUCT TO 4 SLURRY DISTRIBUTION STATIONS. CONTACT: XENON LONG PAGER 368-50 99109 NO STRUCTURAL FNL -OK FINAL
|
MEC96-02628
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - BUILDING 24/CMP BAYS - $6,041.00-PROVIDE TEFLON LINED STA DUCT TO 4 SLURRY DISTRIBUTION STATIONS. CONTACT: XENON LONG PAGER 368-50 99109 NO STRUCTURAL FNL -OK FINAL
|
MEC96-02631
| INSP - Framing/ Rough-in | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - BUILDING FAB 1X-ROOM107D-$7,500.00 NO STRUCTURAL NUMBER-Y ###-#### EXT99109 FABRICATE AND INSTALL DUCTWORK TO EXHAUST THE ACETONE DISTRIBUTION SYSTEM IN ROOM 107D FNL -OK FINAL
|
MEC96-02632
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - BUILDING 24 FAB 4 PH II RELOCATE CHEMICAL CABINETS DEFACI REFACILITATE GENERAL EXHAUST DUCT.$805.00-NO STRUCTURAL NUMBER-XENON LON ###-#### X99109 FNL -OK FINAL
|
MEC96-02632
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - BUILDING 24 FAB 4 PH II RELOCATE CHEMICAL CABINETS DEFACI REFACILITATE GENERAL EXHAUST DUCT.$805.00-NO STRUCTURAL NUMBER-XENON LON ###-#### X99109 FNL -OK FINAL
|
MEC96-02641
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - BUILDING 2 TA-1 ROOF PROVIDE AND INSTALL NEW 32" RND MAKE HANGERS TO PROVIDE RH% FILTRATION CONTROL.YMC JOB M-8300-CONTACT XENON L PAGER 68-5000 X 99109-BLD96-2118- $38,228.00 FNL -OK FINAL
|
MEC96-02641
| INSP - Final | 9/12/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | A | PASS |
|
|
09/18/96 337 - BUILDING 2 TA-1 ROOF PROVIDE AND INSTALL NEW 32" RND MAKE HANGERS TO PROVIDE RH% FILTRATION CONTROL.YMC JOB M-8300-CONTACT XENON L PAGER 68-5000 X 99109-BLD96-2118- $38,228.00 FNL -OK FINAL
|
MEC96-02617
| INSP - Retro Fit (check note) | 9/17/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | P | NH |
|
|
09/18/96 337 - SPACE #11-FURNACE W/H AND A P/T REINSPECTION UGA -UNABLE TO GAIN ACCESS-LEFT NOTC
|
MEC96-02426
| INSP - Gas pressure test | 9/17/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | P | PASS |
|
|
09/18/96 337 - GP -OK GAS PIPING RGHN-OK ROUGH IN
|
MEC96-02518
| INSP - Retro Fit (check note) | 9/17/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | P | PASS |
|
|
09/18/96 337 - FNL -OK FINAL
|
MEC96-02690
| INSP - Retro Fit (check note) | 9/17/1996 | 9/17/1996 | 9/18/1996 12:00:00 AM | P | FAIL |
|
|
09/18/96 337 - FURNACE AND GAS LINE -- NEEDS PRESSURE TEST GAS CO SAID FURNACE NOT VENTING GOOD NO PRESSURE TEST ON
|
MEC96-02683
| INSP - Gas pressure test | 9/16/1996 | 9/17/1996 | 9/17/1996 12:00:00 AM | A | FAIL |
|
|
ELMERS
|
PLM96-02295
| INSP - Final | 9/16/1996 | 9/17/1996 | 9/17/1996 12:00:00 AM | A | FAIL |
|
|
09/16/96 37 - THIS DOESN'T SHOW A R-IN PASSING-AJB roughin was passed, i remember doing it on a correction notice fail code spout needed for leg tub -tub drain not connected, strainer co missing on shower- l/t not installed
|
PLM96-02752
| INSP - Sprinkler & Backflow | 9/16/1996 | 9/17/1996 | 9/17/1996 12:00:00 AM | A | PASS |
|
|
09/16/96 37 - HE SAID HE NEEDED THIS DONE ASAP SO I GAVE HIM GERRYS CELL IF HE PICKED THIS ONE UP
|
PLM96-02759
| INSP - Sprinkler & Backflow | 9/16/1996 | 9/17/1996 | 9/17/1996 12:00:00 AM | A | PASS |
|
|
09/16/96 37 -
|
MEC96-02626
| INSP - Framing/ Rough-in | 9/12/1996 | 9/17/1996 | 9/12/1996 12:00:00 AM | A | CANC |
|
|
09/12/96 337 - $65,000.00-PROVIDE LABOR AND MATERIALS TO FACILITATE THE TOOLS. YMC JOB #M-8315- CONTACT: XENON LONG PAGER: ###-####-EXT. 99109 BLD95-2103 THIS INSPECTION TO BE DONE NEXT TUES
|