PLM97-02361
| INSP - Plumbing Rough-in | 9/16/1997 | 9/17/1997 | 9/17/1997 12:00:00 AM | A | PASS |
|
|
09/17/97 323 - THIRD FLOOR ROUGH- IN OK
|
PLM97-02519
| INSP - Final | 9/16/1997 | 9/17/1997 | 9/17/1997 12:00:00 AM | A | FAIL |
|
|
09/17/97 323 - READY AT 11 A.M. CORRECTIONS NEEDED -- CHARGE 30.00 REINSPECTION FEE
|
PLM97-02608
| INSP - Final | 9/16/1997 | 9/17/1997 | 9/17/1997 12:00:00 AM | A | PASS |
|
|
09/17/97 323 - Scheduled by Hello! on 09/16/97 at 14:12:37. FINAL OK
|
PLM97-02759
| INSP - Plumbing Rough-in | 9/16/1997 | 9/17/1997 | 9/17/1997 12:00:00 AM | A | FAIL |
|
|
09/17/97 323 - NEEDS ROUGH-IN DOSEN'T HAVE A THE BACKFLOW PREVENTER CHEC CORRECTION NEEDED - NAIL PLATES -PROTECT COPPER FROM STUDS
|