ELE01-00525
| ELE-Aging Inspection | 9/17/2001 | 9/17/2001 | 9/17/2001 12:00:00 AM | | NR |
|
|
suc 9/18/2001 7:34:47 AM
|
ELE01-03172
| Electrical Rough-In | 9/14/2001 | 9/17/2001 | 9/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/14/2001 at 15:01:06. Contact: ###-####. corrections made ri ok cover 9/17/2001 3:46:24 PM
|
ELE01-02111
| Final | 9/17/2001 | 9/17/2001 | 9/17/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 06:48:45. Contact: ###-####. ok final 9/17/2001 10:10:58 AM
|
ELE01-03224
| Rough-In Permanent Service | 9/17/2001 | 9/17/2001 | 9/17/2001 12:00:00 AM | P | PASS |
|
|
emmett ###-#### r/i & ser p/s u/g n ok survey 210-52 12 ft spacing up stairs & 1 1/4 inch from edge of framing members 9/17/2001 4:24:10 PM
|
ELE01-01786
| Final | 9/17/2001 | 9/17/2001 | 9/17/2001 12:00:00 AM | P | NH |
|
|
###-#### no one home left sticker 324 to call steve 9/17/2001 1:04:47 PM
|
ELE01-03038
| Electrical Rough-In | 9/17/2001 | 9/17/2001 | 9/17/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/17/2001 at 10:03:44. Contact: ###-####. ok cover area 3 sub fab ceilings corridor #000C & 000H 9/17/2001 3:14:38 PM
|