Inspections for the day of: Monday, September 17, 2001.
Number of inspections: 19
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00084 BLD-Aging Inspection9/17/20019/17/20019/17/2001 12:00:00 AM FAIL
called ken lift a message no reply 9/18/2001 4:37:15 PM
BLD01-00912 BLD-Aging Inspection9/17/20019/17/20019/17/2001 12:00:00 AM DONE
work in progress 9/17/2001 10:01:28 AM
BLD01-00489 BLD-Aging Inspection9/17/20019/17/20019/17/2001 12:00:00 AM PASS
BLD01-00973 BLD-Aging Inspection9/17/20019/17/20019/17/2001 12:00:00 AM PASS
done with out inspection 9/17/2001 10:00:06 AM
BLD01-00524 BLD-Aging Inspection9/17/20019/17/20019/17/2001 12:00:00 AM PASS
BLD01-00173 BLD-Final9/14/20019/17/20019/17/2001 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/14/2001 at 12:30:38. Contact: ###-####.
MIS01-00154 BLD-Conference9/14/20019/17/20019/17/2001 12:00:00 AMAPASS
###-#### or ###-#### Shawn r/i for block and tie downs 9/17/2001 9:56:17 AM
BLD01-02374 BLD-Foundation9/14/20019/17/20019/17/2001 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/14/2001 at 14:30:04. Contact: ###-####. work in progress all look good 9/17/2001 10:46:16 AM
MEC01-02740 Rough-in9/14/20019/17/20019/17/2001 12:00:00 AMANR
Scheduled by a contractor via Hello! on 09/14/2001 at 16:01:39. Contact: ###-####. premit is addressed wrong gas pressure test failed on north unit piping also note tied down no fans are installed 9/17/2001 9:40:41 AM
MEC01-02740 Pressure Test9/14/20019/17/20019/17/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/14/2001 at 16:02:05. Contact: ###-####. south unit passed but north unit failed 9/17/2001 9:41:24 AM
MEC01-02723 Rough-in9/17/20019/17/20019/17/2001 12:00:00 AMAFAIL
Scheduled by a contractor via Hello! on 09/17/2001 at 07:16:44. Contact: ###-####. crew is still working on house said they wouldnt be ready till after noon told them to recall 9/17/2001 11:08:19 AM
BLD01-02405 BLD-Footing9/17/20019/17/20019/17/2001 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/17/2001 at 07:39:57. Contact: ###-####.
BLD01-01920 BLD-Foundation9/17/20019/17/20019/17/2001 12:00:00 AMPFAIL
###-#### work out side of org scope resubsit plans 9/17/2001 2:10:32 PM
BLD01-01734 BLD-Framing/Rough-in9/17/20019/17/20019/17/2001 12:00:00 AMPNR
shear wall--ed-- ###-#### still working on nialing panels 9/17/2001 1:35:04 PM
BLD00-02604 BLD-Final9/17/20019/17/20019/17/2001 12:00:00 AMPNR
BLD01-02241 BLD-Footing9/17/20019/17/20019/17/2001 12:00:00 AMPPART
###-#### work in progress crew still setting forms 9/17/2001 3:36:00 PM
BLD01-00106 BLD-Framing/Rough-in9/17/20019/17/20019/17/2001 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 09/17/2001 at 10:25:07. Contact: ###-####. ok to start covering third floor still need to check 1hr fire assm on fans ligths ext 9/17/2001 2:23:43 PM
BLD01-02242 BLD-Framing/Rough-in9/17/20019/17/20019/17/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/17/2001 at 10:34:05. Contact: ###-####. no city aprv plans on site 9/17/2001 1:35:58 PM
BLD01-02243 BLD-Framing/Rough-in9/17/20019/17/20019/17/2001 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/17/2001 at 10:35:14. Contact: ###-####. no city appr plans on site 9/17/2001 1:35:32 PM