Inspections for the day of: Tuesday, September 17, 2002.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Sly
TitleBLD-COM/RES INSPECTOR
Phone #794-9465
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD02-01089 BLD-Framing/Rough-in9/16/20029/17/20029/17/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/16/2002 at 13:14:21. Contact: ###-####. C/N posted. 9/17/2002 11:42:15 AM
BLD02-01110 BLD-Framing/Rough-in9/16/20029/17/20029/17/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/16/2002 at 13:15:28. Contact: ###-####. C/N posted. 9/17/2002 11:42:33 AM
BLD02-01111 BLD-Framing/Rough-in9/16/20029/17/20029/17/2002 12:00:00 AMAPART
Scheduled by a contractor via Hello! on 09/16/2002 at 13:16:34. Contact: ###-####. C/N posted. 9/17/2002 11:42:53 AM
BLD02-02104 BLD-Framing/Rough-in9/16/20029/17/20029/17/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/16/2002 at 19:41:49. Contact: ###-####.
BLD02-01473 BLD-Final9/17/20029/17/20029/17/2002 12:00:00 AMAPASS
Scheduled by a contractor via Hello! on 09/17/2002 at 07:16:09. Contact: ###-####. C/C issued. 9/17/2002 1:37:34 PM
BLD02-00505 BLD-Final9/17/20029/17/20029/17/2002 12:00:00 AMPFAIL
###-#### Called Mike, notified of Ele02-02750 permit for elevator ....outstanding Will call for final 9/18/02 am. 9/17/2002 1:44:01 PM
BLD02-01394 BLD-Energy code compliance9/17/20029/17/20029/17/2002 12:00:00 AMPPASS
###-####
MEC02-02516 Pressure Test9/17/20029/17/20029/17/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 09/17/2002 at 11:05:07. Contact: ###-####.
BLD02-01591 BLD-Final9/17/20029/17/20029/17/2002 12:00:00 AMPPASS
john; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie C/C issued. 9/17/2002 1:37:55 PM