BLD02-01528
| BLD-Conference | 9/12/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | PASS |
|
|
THIS CONF IS SET FOR 9AM....add'l c/n issued: complete prior items, add proper ladder framing, brg. studs, nail-off hangers, sheathing, etc. 9/17/2002 1:59:00 PM
|
BLD02-01528
| BLD-Conference | 9/12/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | PASS |
|
|
THIS CONF IS SET FOR 9AM....addl c/n issued to fix prior items. 9/17/2002 3:00:49 PM
|
BLD01-01347
| BLD-Framing/Rough-in | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/16/2002 at 14:18:03. Contact: ###-####. wip on 4 th floor store room 9/17/2002 11:30:21 AM
|
BLD02-01937
| BLD-Framing/Rough-in | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | CANC |
|
|
###-#### MARK
|
BLD02-01874
| BLD-Final | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PART |
|
|
###-#### c/n, clarify tenant, address, seall floor penetrations, mezz. tenant needs c/o.?? ok for t/o. 9/17/2002 6:38:40 PM
|
BLD02-01106
| BLD-Final | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PART |
|
|
###-#### c/n onsite...clarify tenant, address, loft tenant needs c/o... 9/17/2002 6:24:02 PM ok for t/o 9/17/2002 6:37:26 PM
|
BLD02-01883
| BLD-Framing/Rough-in | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PART |
|
|
PETE; Phone #: ###-#### Internet Inspection Request from: Annette Moore
PLEASE CALL 1ST, elec R/I is passed, need hvac... 9/17/2002 2:25:23 PM
|
BLD02-01674
| BLD-Concrete | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 10:58:44. Contact: ###-####....pan, welding & deck under spec insp. 9/17/2002 4:32:23 PM
|
BLD01-01434
| BLD-Conference | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PASS |
|
|
|
BLD02-00276
| BLD-Conference | 9/10/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | CANC |
|
|
|