Inspections for the day of: Tuesday, September 17, 2002.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorJim Johnson
TitlePLM-INSPECTOR
Phone #794-9476
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
PLM02-02849 Plumbing Rough-in9/16/20029/17/20029/17/2002 12:00:00 AMAFAIL
r/i- john- ###-####--ext 34-- pipe t&p to approved location pipe hose bibb,s with approved material and fitting,s make approved connection at building sewer support building drain every 4 foot and pex water piping every 32 inches 9/17/2002 11:59:27 AM
PLM02-02457 Plumbing Rough-in9/16/20029/17/20029/17/2002 12:00:00 AMAPASS
###-####
PLM02-02202 Plumbing Rough-in9/17/20029/17/20029/17/2002 12:00:00 AMAPASS
PLM02-02855 Groundwork9/17/20029/17/20029/17/2002 12:00:00 AMPPASS
PLM02-02438 Final9/16/20029/17/20029/17/2002 12:00:00 AMPPASS
sharon; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
PLM02-02463 Final9/17/20029/17/20029/17/2002 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 09/17/2002 at 08:32:24. Contact: ###-####. need to trap indirect waste line on 3 comp sink upc 803 remove no-hub band,s and use approved fitting,s and adapter,s on prep and 3 comp sink,s upc 316.2.3 need to provide rp for ice and coffee machine 9/17/2002 5:35:54 PM
PLM02-02855 Plumbing Rough-in9/17/20029/17/20029/17/2002 12:00:00 AMPNR
Scheduled by a contractor via Hello! on 09/17/2002 at 08:35:31. Contact: ###-####.
PLM02-02742 Water and/or Sewer9/17/20029/17/20029/17/2002 12:00:00 AMPPASS
storm drains\\###-####