BLD02-00676
| BLD-Final | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | FAIL |
|
|
keith; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie
walk through only, need trades, insulation under floor, firecaulking, achd 9/17/2002 11:07:14 AM
|
BLD00-02990
| BLD-Conference | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | NR |
|
|
wip,, no contact,, ok to extend 9/17/2002 10:13:05 AM
|
BLD02-00240
| BLD-Conference | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | PASS |
|
|
janice ###-#### statis of bp
final ok 9/17/2002 10:35:08 AM
|
BLD02-02002
| BLD-Foundation | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 05:42:12. Contact: ###-####.
|
MEC02-02488
| Rough-in | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 07:16:28. Contact: ###-####.c/n still posted 9/17/2002 12:09:48 PM
|
MEC02-02488
| Pressure Test | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 07:16:45. Contact: ###-####.
|
MEC01-03336
| Final | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | CANC |
|
|
###-#### kivin--cancel per kevin
|
BLD02-01982
| BLD-Footing | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | PART |
|
|
###-#### JIM
wip, soil test on compaction at wall insp. 9/17/2002 10:32:18 AM
|
MEC02-01716
| Final | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | A | PASS |
|
|
|
BLD01-02929
| BLD-Final | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | CANC |
|
|
kevin ###-####--cancel per kevin
|
BLD01-02756
| BLD-Conference | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PASS |
|
|
DAN ###-####
conf. on procedure, ok to continue 9/17/2002 2:58:34 PM
|
BLD02-00035
| BLD-Final | 9/16/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | CANC |
|
|
###-####--cancel per kevin
|
BLD01-02756
| BLD-Conference | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PASS |
|
|
PERMIT EXTENSION PER GEORGE SLANE
|
MEC02-00723
| Final | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by a contractor via Hello! on 09/17/2002 at 09:37:15. Contact: ###-####.
|
MEC02-02603
| Pressure Test | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | PASS |
|
|
###-####
|
BLD02-00402
| BLD-Framing/Rough-in | 9/17/2002 | 9/17/2002 | 9/17/2002 12:00:00 AM | P | FAIL |
|
|
fr insp cory -###-####--call 1st before insp
conf. only, ceiling lighting, need to be sealed units, listed, and installed per specs.,,, also ok to cover soffit areas 9/17/2002 4:00:22 PM
|
MEC02-02613
| Rough-in | 9/16/2002 | 9/17/2002 | 9/16/2002 12:00:00 AM | A | CANC |
|
|
###-#### Disp set to [CANC] by a contractor via Hello! on 09/16/2002 at 16:05:29.
|