Inspections for the day of: Wednesday, September 17, 2003.
Number of inspections: 4
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD03-01334 FIRE-Final Inspection9/16/20039/17/20039/17/2003 12:00:00 AMPFAIL
the new duct smoke detectors shall be connected to the existing fire alarm system. This work will require permits 9/18/2003 8:54:44 AM
FIR02-00226 INSP-Final Inspection9/17/20039/17/20039/17/2003 12:00:00 AMPFAIL
The fire alarm contractor and I could not find any approved plans on site. Inspection to be rescheduled 9/18/2003 1:57:47 PM
FIR03-00267 INSP-Final Inspection9/17/20039/17/20039/17/2003 12:00:00 AMPFAIL
Provide breaker locks, provide breaker location in the nac panel, put the heater supply circuit on the facp circuit for supervision, provide placard per note #2, field inspector to verify with sam rogers cooling for the nac panel enclosures, provide fax of todays signal. There may be problems with what was send and how it was received 9/17/2003 4:17:13 PM
FIR03-00276 INSP-Final Inspection9/17/20039/17/20039/17/2003 12:00:00 AMPFAIL
Provide breaker locks, provide breaker location in the nac panel, put the heater supply circuit on the facp circuit for supervision, provide placard per note #2, field inspector to verify with sam rogers cooling for the nac panel enclosures, provide fax of todays signal. There may be problems with what was send and how it was received 9/17/2003 4:17:20 PM