ESC04-00033
| Site Preparation | 9/17/2004 | 9/17/2004 | 9/17/2004 12:00:00 AM | A | PART |
|
|
Job site is mostly in compliance with ESC plan. Informed RP to be aware of the drop inlet located in the street. Crews are doing a good job of keep street/curb and sidewalk swepth. 9/17/2004 10:57:57 AM
|